Hank Iore

A 4-foot high concrete wall is going up along a stretch of Far Rockaway. June 19, 2013. (credit: Marla Diamond/WCBS 880)

Storm Protection Measures Going Up Along Part Of Far Rockaway

The storm barrier of more than 7,500 bags filled with 20,000 tons of sand will stretch from Beach 55th Street to Beach 149th Street when the dune construction project begins next month.

06/19/2013