Long Beach BRanch

Sunday morning LIRR service Nov. 25, 2012 (credit: Monica Miller/WCBS 880)

LIRR Service Back On All 11 Branches; PATH, Ferry Service Coming For Monday Commute

The Long Beach Branch had be running via diesel trains since service resumed nearly two weeks ago. The resumption of electric service now means that all 11 LIRR branches are fully operational for the first time since Sandy hit, Gov. Cuomo said.

11/25/2012

West Broadway is seen covered in beach sand due to flooding from Hurricane Sandy on October 30, 2012 in Long Beach. (credit: Mike Stobe/Getty Images)

Limited Long Beach Branch LIRR Service Resumes With Diesel Trains

The resumption of service on the Long Beach Branch means all 10 LIRR branches are back in operation following superstorm Sandy.

11/14/2012

FILE PHOTO

Long Island Rail Road Service Returning To Hard-Hit Long Beach

That means all 10 LIRR branches are now running trains connecting New York City and Long Island for the first time since Superstorm Sandy struck two weeks ago.

11/13/2012

LIRR-Trains

MTA Announces Schedule Changes On A Number Of LIRR Lines Ahead Of Work Week

Temporary repairs to an East River Amtrak tunnel have allowed for the reopening of a number of lines but with a reduced number of trains able to travel through the tunnel.

11/11/2012