CBS2-Header-Logo WFAN 1010WINS WCBS tiny WLNYLogo

fatal Metro-North derailment

Metro-North employees work to repair a signal switching house in Cos Cob, Conn., following a fire there on May 10, 2014. (credit: Patrick Cashin/MTA)

Switching House Fire Expected To Cause Delays On Metro-North New Haven Line ‘For Weeks’

Along a nine-mile stretch between Port Chester and Stamford, the system has gone from three rush hour direction tracks to two.

05/12/2014

New Haven line commuters wait for a train. (credit: CBS 2)

Metro-North To Begin Work To Increase Power Supply For New Haven Line

The railroad has been beefing up its power supply system since a Con Ed feeder cable blew out in Mount Vernon late last September. Service came to a screeching halt on the New Haven line for nearly two weeks.

04/18/2014

Aftermath of the fatal Metro-North Railroad derailment, as seen from Chopper 880 on Dec. 2, 2013. (credit: Tom Kaminski/WCBS 880)

NTSB: Engineer In Fatal Metro-North Derailment Has ‘Severe Obstructive Sleep Apnea’

A medical document made available Monday by the National Transportation Safety Board said engineer William Rockefeller has “severe obstructive sleep apnea.”

04/07/2014