Traffic

8/29/2016 9:14:00 PM
9th St/Central Ave/Lakewood Farmingdale Rd/Asbury Ave/Lakehurst-Whitesville Rd/Asbury Rd - Stopped traffic - Estimated delay 00:01 - Stopped traffic in Ocean on Asbury Ave/Asbury Rd/Central Ave/Hope Chapel Rd/Lakewood Farmingdale Rd/Madison Ave/Ridgeway Blvd/RI SB between Ridgeway Blvd and Hwy 70
8/29/2016 9:16:00 PM
US-9 - Slow traffic - Estimated delay 00:01 - Slow traffic in Toms River on US-9 SB between Clayton Ave and Indian Head Rd
8/29/2016 9:10:00 PM
US-9 - Stopped traffic - Stopped traffic in Lakewood on US-9 NB between Chestnut Street and Cross Street
8/29/2016 4:55:46 AM
Bridge & tunnel information in 1A. Hudson River Crossings - call tips to 212-377-7757
8/29/2016 7:06:59 PM
Normal services not operating in Septa
8/29/2016 5:13:35 AM
Normal services not operating in Septa Regional Rails
8/29/2016 8:04:02 PM
Special parking restrictions in force in New York City
8/29/2016 8:54:20 PM
46th Street - Closed in Kings on 46th Street EB between 11th Avenue and 12th Avenue
8/29/2016 5:36:06 PM
5th Avenue - Closed due to road construction in Bklyn on 5th Avenue SB between 64th Street and 65th St
8/29/2016 5:36:06 PM
5th Avenue - Closed due to road construction in Bklyn on 5th Avenue NB between 65th St and 64th Street
8/29/2016 9:12:00 PM
9th St/Central Ave/Lakewood Farmingdale Rd/Asbury Ave/Lakehurst-Whitesville Rd/Asbury Rd - Slow traffic - Estimated delay 00:02 - Slow traffic in Farmingdale on Asbury Ave/Asbury Rd/Central Ave/Hope Chapel Rd/Lakewood Farmingdale Rd/Madison Ave/Ridgeway Blvd/RI SB between Tinton Falls Rd and Main St
8/29/2016 9:14:00 PM
9th St/Central Ave/Lakewood Farmingdale Rd/Asbury Ave/Lakehurst-Whitesville Rd/Asbury Rd - Stopped traffic - Estimated delay 00:01 - Stopped traffic in Ocean on Asbury Ave/Asbury Rd/Central Ave/Hope Chapel Rd/Lakewood Farmingdale Rd/Madison Ave/Ridgeway Blvd/RI SB between Ridgeway Blvd and Hwy 70
8/29/2016 12:09:04 PM
Adams Ave/Whitaker Ave - Closed due to road construction in Lawncrest on Adams AVE Both NB/SB between Rising SUN AVE and Crescentville Rd
8/29/2016 12:16:23 PM
Aramingo Ave - On-ramp closed in Frankford on Aramingo Ave Both NB/SB at Ramp To I-95 SB
8/29/2016 8:53:47 PM
Atlantic City Expy - Slow traffic - Estimated delay 00:03 - Incident cleared in Hamilton Twp on Atlantic City Expy EB at Exit 14/Atlantic City Race Track, slow traffic back to Exit 17/Rt-50/Egg Harbor/Mays Landing
8/29/2016 8:53:47 PM
Atlantic City Expy - Slow traffic - Estimated delay 00:03 - Incident cleared in Hamilton Twp on Atlantic City Expy EB at Exit 14/Atlantic City Race Track, slow traffic back to Exit 17/Rt-50/Egg Harbor/Mays Landing
8/29/2016 9:14:00 PM
Atlantic City Expy - Stop and go traffic - Stop and go traffic in Atlantic City on Atlantic City Expy EB between Expy Connector/N Missourri Ave/N Arkansas Ave/Baltic Ave and Baltic Ave/Fairmount Ave
8/29/2016 12:09:04 PM
Benjamin Franklin Pkwy - Major road construction in Center City on Ben Franklin Parkway Outbound between Logan Square and 20th St
8/29/2016 12:09:04 PM
Benjamin Franklin Pkwy - New road construction layout in Philadelphia on Ben Franklin Parkway Inbound between 21st St and Logan Square
8/29/2016 10:56:14 AM
Benjamin Franklin Pkwy - Major event in Center City on Ben Franklin Parkway Both EB/WB at Art Museum Circle/Eakins Oval/Kelly Dr
8/29/2016 8:13:58 PM
Brooklyn Battery Tunnel - Road construction, roadway reduced to one lane in Bklyn on The Hugh Carey Battery Tunnel WB between The Tolls and Trinity Pl/West Side Hwy
8/29/2016 5:01:16 AM
CR-518 - Closed due to road construction in Kendall Park on Rt 518 WB between Hwy 27/Lincoln Hwy and Crescent Ave
8/29/2016 5:01:16 AM
CR-518 - Closed due to road construction in Rocky Hill on Rt 518 EB between Crescent Ave and Hwy 27/Lincoln Hwy
8/29/2016 9:14:00 PM
CR-523 - Stop and go traffic - Stop and go traffic in Readington on CO Hwy 523 SB between US 22 and US 22/Old Highway 28
8/29/2016 9:16:00 PM
CR-563 - Slow traffic - Estimated delay 00:01 - Slow traffic in Atlantic on Tilton Rd SB between US 322/US 40/Uibel Ave and US 322/US 40/Black Horse Pike (Egg Harbor Township) (North)
8/29/2016 9:14:00 PM
CR-575 - Slow traffic - Estimated delay 00:03 - Slow traffic in Egg Harbor Twp on CR-575 SB between Atlantic City Expressway and US 322/US 40/Black Horse Pike
8/29/2016 9:10:00 PM
CR-626 - Slow traffic - Slow traffic in Hunterdon on CO Hwy 626 WB between US 22 and Hwy 31
8/29/2016 6:46:50 AM
Carter Rd/Hopewell Princeton Rd - Closed due to road construction in Lawrence on Carter Rd (CR-569) Both NB/SB between US 206/Lawrenceville Rd/Main St and Rosedale Rd
8/29/2016 9:14:00 PM
Chevalier Ave - Slow traffic - Slow traffic in Middlesex on Chevalier Ave EB between Garden State Pkwy and US 9/Hwy 35
8/29/2016 9:26:26 AM
Chews Landing Rd - Closed due to road construction in Gloucester Twp on Chews Landing Rd Both EB/WB between Rt-168/Black Horse Pike and Laurel Rd as reported by police
8/29/2016 8:16:46 PM
Ct-15 - Road construction, left lane closed in Stamford on Hwy 15 SB between Exit 33 Den Rd and Exit 31 North St
8/29/2016 8:19:30 PM
Ct-15 - Road construction, right lane closed in Stamford on Hwy 15 NB between Exit 33 Den Rd and Exit 36 Rt 106 / Old Stamford Rd
8/29/2016 4:28:38 AM
Ct-2 - Ramps closed in East Hartford on Rt 2 WB at The Founders Bridge
8/29/2016 9:14:00 PM
Ct-3 - Slow traffic - Slow traffic in Wethersfield on Hwy 3 NB between Elm St and I 91
8/29/2016 7:20:19 PM
Ct-72 - Road construction, right lane closed in New Britain on Ct-72 EB between Ct-372/Corbin Ave/Exit 7 and Columbus Blvd
8/29/2016 8:16:46 PM
Ct-8 - Road construction, two lanes closed in Bridgeport on CT - 8/25 Connector NB between Exit 2 Golden Hill St / Main St (N) and Exit 5 Rt 1 / Boston Ave / North Ave
8/29/2016 7:51:49 PM
Eagle Rock Ave - Closed due to road construction in Roseland on Eagle Rock Ave EB between Baldwin Ct and Laurel Ave
8/29/2016 7:51:49 PM
Eagle Rock Ave - Closed due to road construction in Roseland on Eagle Rock Ave WB between Laurel Ave and Baldwin Ct
8/29/2016 9:14:19 PM
FDR Dr - Incident cleared on The FDR Drive SB at 79th St
8/29/2016 9:14:00 PM
Garden State Pkwy - Stop and go traffic - Estimated delay 00:01 - Stop and go traffic in Bloomfield on The Garden State Pkwy NB between X148/Bloomfield Ave and X149/Belleville Ave
8/29/2016 9:14:00 PM
Garden State Pkwy - Stop and go traffic - Estimated delay 00:06 - Stop and go traffic in East Orange on Garden State Parkway NB between X145/I-280 and X147/Walnut St
8/29/2016 8:29:03 PM
Garden State Pkwy - Road construction, two lanes closed in Sayreville on The Garden State Pkwy NB between X123/Rt-9 and before The Driscoll Bridge
8/29/2016 9:14:00 PM
Garden State Pkwy - Slow traffic - Estimated delay 00:03 - Slow traffic in East Orange on Garden State Parkway NB between X147/Walnut St and X148/Bloomfield Ave
8/29/2016 9:10:00 PM
Garden State Pkwy - Slow traffic - Slow traffic in Washington on The Garden State Pkwy SB between Hillsdale/Pascack Valley Tolls and X166/Linwood Ave
8/29/2016 8:30:07 PM
Garden State Pkwy - Road construction, right lane closed in Saddle Brook Township on The Garden State Pkwy NB between The Bergen Tolls (NB) and before X165/Ridgewood Ave
8/29/2016 8:54:05 PM
Garden State Pkwy - Road construction, two lanes closed in Middlesex on The Garden State Pkwy SB between The Raritan Tolls (SB) and Cheesequake Park
8/29/2016 9:14:00 PM
I-278 - Slow traffic - Estimated delay 00:01 - Slow traffic in Bklyn: On the B.Q.E. on I-278 EB between Atlantic Ave/x27 and Cadman Plaza/x28A (EB)
8/29/2016 9:12:00 PM
I-278 - Stop and go traffic - Estimated delay 00:07 - Stop and go traffic in Bklyn: On The B.Q.E. on I-278 EB between The Williamsburg Br/Metropolitan Ave/x32 (EB) and McGuiness Blvd/Humboldt St/x33 (EB)
8/29/2016 8:23:17 PM
I-287/I-87 - Road construction, two lanes closed in Tarrytown on The NY State Thruway (I-87/287/Tapp) NB between Thruway/Cross Westchester/I-87/I-287 Split/Merge and The Tappan Zee Bridge Span
8/29/2016 6:47:54 AM
I-295 - Construction work in Bellmawr on I-295 Both NB/SB between Rt-42 (#26) and Rt-168/Exit 28
8/29/2016 12:13:59 PM
I-295 - Construction work in Westville on I-295 Both NB/SB between Rt-47/Exit 25 and Rt-42/Exit 26
8/29/2016 8:02:38 PM
I-295 - Bridge maintenance operations in Warwick on I 295 NB over EX 2 - Bald Hill Rd as reported by ridot
8/29/2016 8:02:38 PM
I-295 - Slow moving maintenance vehicle in Providence on I 295 Both NB/SB at EX 8 - Douglas Pike as reported by ridot
8/29/2016 8:02:38 PM
I-295 - Slow moving maintenance vehicle in Warwick on I 295 Both NB/SB between Rt 95 Warwick and RI / Mass Line as reported by ridot
8/29/2016 7:08:54 PM
I-295 - Off-ramp closed in Bellmawr on I-295 NB at US-30/Exit 29
8/29/2016 6:05:54 AM
I-295 - Road construction, shoulder closed in Warwick on I 295 Both NB/SB at EX 1 - East Ave as reported by ridot
8/29/2016 8:21:30 PM
I-395 - Road construction, left lane closed in Montville on I 395 NB between Exit 9 Rt 2A East and Exit 11/ W Rt 82 / Downtown
8/29/2016 8:11:40 PM
I-395 - Road construction, left lane closed in New London on I 395 NB between Exit 19 Rt 169 (N) and Exit 21/S Rt 12
8/29/2016 8:21:30 PM
I-395 - Road construction, left lane closed in Norwich on I 395 SB between Exit 11/ W Rt 82 / Downtown and Exit 6/ Rt 163
8/29/2016 9:14:00 PM
I-495 Frontage/Service Rd - Slow traffic - Estimated delay 00:01 - Slow traffic in Medford on L.I.E Service Road WB between Horseblock Rd and I 495/Hwy 112/Medford Ave
8/29/2016 9:14:44 PM
I-678 - Stop and go traffic - Estimated delay 00:06 - Stop and go traffic in Queens: On The Van Wyck Exwy on I-678 (Van Wyck/Whitestone) NB between Rockaway Blvd/X2 and Queens BL/NY Rt-25 /X9 (NB)
8/29/2016 9:14:44 PM
I-678 - Stop and go traffic - Estimated delay 00:04 - Stop and go traffic in Bronx on I-678 (Van Wyck/Whitestone) SB between North Of Whitesone BR South Of I-95/Cross Bronx and 3rd Ave/The Whitestone Bridge/Queens Side
8/29/2016 9:12:00 PM
I-678 - Slow traffic - Slow traffic in Queens: On The Van Wyck Expwy on I-678 (Van Wyck/Whitestone) SB between The Grand Central Pkwy/Kew Gardens Interchange (NB)/X10 and Main St/X8 (NB)
8/29/2016 9:10:00 PM
I-684 - Slow traffic - Estimated delay 00:01 - Slow traffic in Purdys on I-684 SB between NY Rt-116/X7 (NB) and NY Rt-138/Goldens Bridge Rd/X6a (SB)
8/29/2016 9:06:45 PM
I-76 - Slow traffic - Slow traffic in Philadelphia on I-76 WB between University Ave and South St/Exit 346
8/29/2016 8:06:55 PM
I-78 - Road construction, two lanes closed in Bethlehem Twp on I-78 WB near NJ-173/Exit 7 and before Bloomsbury Rd/Exit 6
8/29/2016 8:05:43 PM
I-80 - Road construction, two lanes closed in Bergen on I-80 EB between x62B/Saddle River Rd and x63/Riverview Ave
8/29/2016 9:10:00 PM
I-80 - Stop and go traffic - Estimated delay 00:03 - Stop and go traffic in Woodland Park on I-80 EB between X56/Squirrelwood Rd and x57/Rt-19/Main St
8/29/2016 7:40:21 PM
I-84 - Road construction, left lane closed in Waterbury on I 84 WB between Exit 19 Rt 8 South and Exit 18 Chase Pkwy (E) / West Main St / Highland Ave (W)
8/29/2016 8:16:46 PM
I-84 - Road construction, two lanes closed in Farmington on I 84 EB between Exit 37 Fienemann Rd and Exit 39 Rt 4
8/29/2016 7:34:32 PM
I-84 - Road construction, right lane closed in Waterbury on I 84 EB between Exit 25a Austin Rd and Exit 27 I-691 (E)
8/29/2016 4:28:50 AM
I-84 - Long-term road construction in Plainville on I 84 EB between Exit 33 Rt 72 West and Exit 36 Slater Rd
8/29/2016 7:53:41 PM
I-87 - Road construction, left lane closed in Ardsley on I-87 (Deegan/Thruway) SB between Saw Mill River Pkwy/x7A and Saw Mill River Rd/x7
8/29/2016 11:02:00 AM
I-87 - Road construction, left lane closed in Ardsley on I-87 (Deegan/Thruway) NB between Saw Mill River Rd/x7 and Saw Mill River Pkwy/x7A
8/28/2016 10:31:12 PM
I-87 - Long-term road construction in The Bronx: On The Major Deegan Expwy on I-87 (Deegan/Thruway) NB between 138th St/Grand Concourse/3rd Ave/X3 and Cross Bronx/GWB Ramps/x7
8/29/2016 9:12:00 PM
I-91 - Slow traffic - Slow traffic in Hartford on I 91 SB between Exit 27 Airport Rd / Brainard Rd (N) and US 5/Hwy 15/Exit 28
8/29/2016 9:12:00 PM
I-91 - Stop and go traffic - Estimated delay 00:02 - Stop and go traffic in Hartford on I 91 SB between US 5/Exit 29 and Exit 27 Airport Rd / Brainard Rd (N)
8/29/2016 8:19:30 PM
I-91 - Construction work in Wallingford on I 91 SB between Exit 15 Rt 68 and Exit 14 Rt 150 / East Center St
8/29/2016 8:16:46 PM
I-91 - Road construction, left lane closed in Enfield on I 91 SB between Exit 47e/W Rt 190 East & West and Exit 46 Rt 5 / King St
8/29/2016 8:16:46 PM
I-91 - Road construction, left lane closed in Enfield on I 91 NB between Exit 47e/W Rt 190 East & West and Exit 48 Rt 220 / Elm St
8/29/2016 9:12:00 PM
I-95 - Stopped traffic - Estimated delay 00:13 - Stopped traffic in Bridgeport on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) NB between Exit 28/East Main St (NB) and Exit 30/Lordship Blvd/Ct Route 113 (NB)
8/29/2016 8:02:38 PM
I-95 - Road construction, two lanes closed in Warwick on I 95 Both NB/SB at EX 13 - Airport Connector as reported by ridot
8/29/2016 8:02:38 PM
I-95 - Slow moving maintenance vehicle in CT / RI Line on I 95 Both NB/SB between RI/CT State Line and EX 7 - New London Tpk as reported by ridot
8/29/2016 9:12:00 PM
I-95 - Stopped traffic - Estimated delay 00:28 - Stopped traffic in East Lyme on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Exit 74 Rt 161 and Rocky Neck Connector/Exit 72
8/29/2016 7:52:10 PM
I-95 - Slow moving maintenance vehicle, right lane closed in Port Chester on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Cross Westchester Expressway/I-287/X21 and North Ave/Cedar St/X16
8/29/2016 7:47:36 PM
I-95 - Road construction, left lane closed in New Rochelle: On The New England Thruway on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) NB between Boston Rd/US-1/X15 and North Ave/Cedar St/X16
8/29/2016 9:08:58 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Philadelphia on I-95 SB between Bridge St/Exit 27 and Betsy Ross Bridge/Exit 26, road construction, roadway reduced to two lanes at Betsy Ross Bridge/Exit 26
8/29/2016 9:16:00 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Niantic on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Exit 75 Rt 1 and Exit 74 Rt 161
8/29/2016 8:24:21 PM
I-95 - Road construction, right lane closed in Milford on I-95 SB between Exit 34 Rt 1 and Exit 32 West Broad St
8/29/2016 9:14:00 PM
I-95 - Stopped traffic - Estimated delay 00:14 - Stopped traffic in East Lyme on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Exit 73 Society Rd and Rocky Neck Connector/Exit 72
8/29/2016 8:05:04 PM
I-95 - On-ramp closed on I-95 NB at Cottman Ave/Exit 30
8/29/2016 8:54:20 PM
I-95 - Stop and go traffic - Estimated delay 00:08 - Stop and go traffic in The Bronx: On The Cross Bronx Expressway on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between White Plains Rd/Westchester Ave (x5A) and The Alexander Hamilton Bridge
8/29/2016 9:11:06 PM
I-95 - Closed due to accident in East Lyme on I-95 SB between Exit 74 Rt 161 and Exit 73 Society Rd
8/29/2016 9:14:00 PM
I-95 - Stop and go traffic - Estimated delay 00:02 - Stop and go traffic in Fairfield: on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Exit 26/Wordin Ave and Exit 25/State St/Fairfiled Ave (NB)
8/29/2016 9:12:00 PM
I-95 - Stop and go traffic - Estimated delay 00:01 - Stop and go traffic in Bridgeport on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) NB between Exit 30/Lordship Blvd/Ct Route 113 (NB) and Exit 30/Surf Ave (SB)
8/29/2016 8:17:44 AM
I-95 - On-ramp closed in Philadelphia on I-95 NB at Allegheny Ave/Exit 25
8/29/2016 9:16:00 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Hudson on New Jersey Tpke SB between X17/Rt-3/Lincoln Tunnel/I-495 (SB) and I-495/Lincoln Tunnel Ramps
8/29/2016 9:08:58 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Philadelphia on I-95 SB between Bridge St/Exit 27 and Betsy Ross Bridge/Exit 26, road construction, roadway reduced to two lanes at Betsy Ross Bridge/Exit 26
8/29/2016 9:16:00 PM
I-95 - Slow traffic - Estimated delay 00:05 - Slow traffic in East Lyme on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Rocky Neck Connector/Exit 72 and Lyme St/Exit 70 (SB)
8/29/2016 9:16:00 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Milford on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between School House Rd/Bic Dr/Exit 35 and Fairfield/New Haven County Line (SB)
8/29/2016 9:14:00 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Bridgeport on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Exit 25/State St/Fairfiled Ave (NB) and Exit 24/Black Rock Pike
8/29/2016 9:16:00 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Southport on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Exit 23/US 1 and Exit 22/Round Hill Rd (NB)
8/29/2016 9:10:00 PM
I-95 - Stop and go traffic - Stop and go traffic in Secaucus on New Jersey Tpke SB between I-495/Lincoln Tunnel Ramps and X16e/18e/Lincoln Tunnel/I-495
8/29/2016 8:35:08 PM
I-95 - Stop and go traffic - Estimated delay 00:10 - Road construction, left lane closed in Fairfield on I-95 NB between Exit 23 Rt 1 / Kings Hwy and Exit 25 State St / Commerce Dr (N) / Rt 130 / Fairfield Ave (S), stop and go traffic back to Exit 19 Center St (N) / Rt 1 (S)
8/29/2016 8:11:40 PM
I-95 - Road construction, right lane closed in East Lyme on I-95 SB between Exit 73 Society Rd and Exit 70 Rt 156 / Lyme St (S)
8/29/2016 8:35:08 PM
I-95 - Stop and go traffic - Estimated delay 00:10 - Road construction, left lane closed in Fairfield on I-95 NB between Exit 23 Rt 1 / Kings Hwy and Exit 25 State St / Commerce Dr (N) / Rt 130 / Fairfield Ave (S), stop and go traffic back to Exit 19 Center St (N) / Rt 1 (S)
8/29/2016 8:17:44 AM
I-95 - On-ramp closed in Philadelphia on I-95 NB at Girard Ave/Exit 23
8/29/2016 7:56:45 PM
I-95 (Car Only) - Closed due to road construction in Newark on NJ Turnpike Car Lanes/Inner Rdwy SB from x15E/Truck Rt 1-9/Raymond Blvd to X9-Rt-18
8/29/2016 7:57:02 PM
I-95 (Car Only) - Closed due to road construction in Cranbury Twp on NJ Turnpike Car Lanes/Inner Rdwy NB between Mercer--Middlesex County Border and x15E/Truck Rt 1-9/Raymond Blvd
8/29/2016 1:50:28 PM
La Guardia Arpt Entrance - Closed due to road construction in Queens on La Guardia Arpt Entrance NB between Ditmars Boulevard and LaGuardia Road
8/29/2016 5:17:13 AM
Laurel Ave - Bridge closed in Holmdel on Laurel Ave Both NB/SB between Holland Road and Hwy 35
8/29/2016 8:45:20 PM
Leif Ericson Dr/Belt Pkwy/Shore Pkwy - Slow traffic - Estimated delay 00:01 - Slow traffic in Queens: On The Belt Pkwy on Belt Pkwy EB between Farmers Blvd/X21b and Francis Lewis Blvd/X24a
8/29/2016 9:10:00 PM
Leif Ericson Dr/Belt Pkwy/Shore Pkwy - Stop and go traffic - Estimated delay 00:06 - Stop and go traffic in Bklyn on Belt Pkwy WB between Bay Pkwy/x5 and Verrazano BR/X3
8/29/2016 8:17:44 AM
N Delaware Ave - Off-ramp closed in Fishtown on NB Delaware AVE WB at I 95/Delaware Ave/Aramingo Ave
8/29/2016 6:48:18 AM
N Delaware Ave - Construction work in Philadelphia on Delaware Ave Both EB/WB between Frankford Ave and I 95/Delaware Ave/Aramingo Ave
8/29/2016 9:12:00 PM
NJ-183 - Slow traffic - Estimated delay 00:01 - Slow traffic in Netcong/Morris County on NJ-183 NB between I-80 and US-46/Ledgewood Ave
8/29/2016 9:16:00 PM
NJ-20 - Stop and go traffic - Estimated delay 00:02 - Stop and go traffic in Fair Lawn on Rt. 20 SB between Hwy 208 and 5th Ave
8/29/2016 8:05:50 PM
NJ-21 - Construction work in Newark on Rt-21 NB between Bridge St and Clay St
8/29/2016 8:05:50 PM
NJ-21 - Construction work in Newark on Rt-21 SB between Clay St and Bridge St
8/29/2016 9:12:00 PM
NJ-31 - Slow traffic - Estimated delay 00:01 - Slow traffic in Flemington on Rt-31 NB between Main St (Flemington) (South) and US 202/New Jersey Route 12
8/29/2016 9:14:00 PM
NJ-31 - Slow traffic - Estimated delay 00:01 - Slow traffic in Clinton on Rt-31 SB between I 78 and Regional Rd
8/29/2016 3:11:34 PM
NJ-35 - Construction work in Woodbridge on Rt-35 SB between CR-656/Smith St and Rt-35/Victory Brg
8/29/2016 3:11:28 PM
NJ-35 - Construction work in Sayreville on Rt-35 NB between Rt-35/Victory Brg and CR-656/Smith St
8/29/2016 9:16:00 PM
NJ-42 - Slow traffic - Slow traffic in Washington Twp on Rt-42 SB between Ganttown Rd and Fries Mill Rd
8/29/2016 6:38:17 AM
NJ-42 - Long-term road construction in Deptford on Rt-42 Both NB/SB between Rt-544/Exit 12 and I-295 as reported by njtoc
8/28/2016 9:38:09 PM
NJ-440 - Ramp restrictions in Perth Amboy on Rt-440/Middlesex Cnty SB at Rt-35/Rt-184/Pfeiffer Blvd
8/29/2016 7:31:58 PM
NJ-440 - Bridge closed in Bayonne on Rt 440/Jersey City/Bayonne/Bayonne BR/NJ Side NB between Mid-Span and Bayonne Brg
8/29/2016 7:31:43 PM
NJ-440 - Bridge closed in Staten Island on Rt 440/Jersey City/Bayonne/Bayonne BR/NJ Side SB between Bayonne Brg and Mid-Span
8/29/2016 9:16:00 PM
NJ-440 - Stopped traffic - Closed in Area of Staten Island Xings/Bayonne Bridge NJ on Rt 440/Jersey City/Bayonne/Bayonne BR/NJ Side SB between Bayonne Brg and Mid-Span, stopped traffic back to Bayonne Brg
8/29/2016 9:16:00 PM
NJ-440 - Stopped traffic - Closed in Hudson on Rt 440/Jersey City/Bayonne/Bayonne BR/NJ Side NB between Mid-Span and Kennedy Blvd/Avenue A, stopped traffic back to Mid-Span
8/29/2016 9:16:00 PM
NJ-440 - Stopped traffic - Closed in Bayonne on Rt 440/Jersey City/Bayonne/Bayonne BR/NJ Side NB between Kennedy Blvd/Avenue A and Bayonne Brg, stopped traffic back to Kennedy Blvd/Avenue A
8/29/2016 9:14:00 PM
NJ-47 - Slow traffic - Estimated delay 00:01 - Slow traffic in Glassboro on Rt-47/Delsea Dr NB between Stanger Ave and US-322/High St
8/29/2016 9:10:00 PM
NJ-47 - Slow traffic - Estimated delay 00:01 - Slow traffic in Glassboro on Rt-47/Delsea Dr NB between Greentree Rd and Woodbury Rd
8/29/2016 9:10:00 PM
NJ-47 - Slow traffic - Estimated delay 00:01 - Slow traffic in Cumberland on Rt-47/Delsea Dr NB between Hunters Mill Rd and Rt-347 (SB Split/NB Merge)
8/29/2016 9:26:17 AM
NJ-50 - Long-term road construction in Tuckahoe on Rt-50 Both NB/SB at Rt-49
8/29/2016 9:12:04 PM
NJ-70 - Construction work in Evesham Twp on Rt-70 Both EB/WB between N Cropwell Rd and Rt-38/Kaighn Ave
8/29/2016 9:14:00 PM
NJ-73 - Slow traffic - Estimated delay 00:03 - Slow traffic in Berlin Twp on Rt-73 NB between CR-675/Cooper Rd and Evesham Rd
8/29/2016 9:10:00 PM
NY-17 - Stop and go traffic - Estimated delay 00:02 - Stop and go traffic in Sullivan on Hwy 17 EB between NY-52/Exit 100 and CR-175/Exit 101
8/29/2016 8:52:52 PM
NY-17K - Closed due to accident in Montgomery on Hwy 17k Both EB/WB between Bracken Rd and CO Hwy 75/Coldenham Rd
8/29/2016 9:10:00 PM
NY-199 - Slow traffic - Estimated delay 00:01 - Slow traffic in Pine Plains on NY-199 WB between NY-82 and NY-82/CR-83A/Main St
8/29/2016 1:33:30 AM
NY-212 - Closed due to road construction in Ulster on NY-212 Both EB/WB between CR-45/Wittenberg Rd and Grogkill Road
8/29/2016 9:12:00 PM
NY-213 - Slow traffic - Estimated delay 00:01 - Slow traffic in Ulster on NY-213 WB between CR-28/Mountain Rd and CR-24/Union Center Rd
8/29/2016 11:02:00 AM
NY-213 - Construction work in Kingston on NY-213 Both EB/WB between Canal St and New Salem Road
8/29/2016 9:14:00 PM
NY-22 - Slow traffic - Slow traffic in Armonk on Rt-22/NY SB between Greenwich Rd and I-684
8/29/2016 9:16:00 PM
NY-22 - Slow traffic - Slow traffic in Armonk on Rt-22/NY SB between Rt-120/King St/Whippoorwill Rd and Rt-120/King St
8/29/2016 9:14:00 PM
NY-27 - Slow traffic - Slow traffic in Wantagh on Sunrise Hwy/NY Rt-27 EB between Wantagh Pwy and Wantagh Ave
8/29/2016 9:16:00 PM
NY-27 - Slow traffic - Estimated delay 00:01 - Slow traffic in Bellmore on Sunrise Hwy/NY Rt-27 WB between Bellmore Ave and Newbridge Rd
8/29/2016 9:08:00 PM
NY-32 - Slow traffic - Estimated delay 00:03 - Slow traffic in Newburgh on Hwy 32 NB between CO Hwy 69/Union Ave and US 9W/Hwy 17k/Robinson Ave/Broadway
8/29/2016 11:45:40 AM
NY-42 - Closed due to road construction in Sparrow Bush on Hwy 42 Both NB/SB between Cahoonzie rd and Bolton Basin Rd
8/29/2016 9:16:00 PM
NY-42 - Stopped traffic - Closed in Deerpark on Hwy 42 SB between Whitehead Rd and Hwy 97, stopped traffic back to Whitehead Rd
8/29/2016 9:16:00 PM
NY-42 - Stopped traffic - Closed in Deerpark on Hwy 42 NB between Hwy 97 and Whitehead Rd, stopped traffic back to Hwy 97
8/29/2016 9:14:44 PM
NY-440 - Accident cleared in Staten Island on The West Shore Xpwy/Rt-440 SB at Bloomingdale Rd/X3 (SB)
8/29/2016 9:16:00 PM
NY-440 - Stopped traffic - Closed in Area of Staten Island Crossings/Bayonne Br on Bayonne Brg SB between Rt-440/Dr Martin Luther King Jr Expy and Bayonne Bridge, stopped traffic back to Rt-440/Dr Martin Luther King Jr Expy
8/29/2016 7:31:58 PM
NY-440 - Bridge closed in Staten Island on Dr. Martin Luther King Jr. Expwy (Rt 440)/The Bayonne BR/Staten Island Side NB between Bayonne Bridge and The Span
8/29/2016 9:16:00 PM
NY-440 - Stopped traffic - Closed in Area of Staten Island Crossings/Bayonne Br on Bayonne Brg SB between The Span and Rt-440/Dr Martin Luther King Jr Expy, stopped traffic back to The Span
8/29/2016 11:55:18 AM
NY-440 - Ramps closed in Staten Island on Dr. Martin Luther King Jr Xpwy/440 NB at Morningstar Rd/Exit 13
8/29/2016 9:16:00 PM
NY-440 - Stopped traffic - Closed in Area of Staten Island Crossings/Bayonne Br on Bayonne Brg NB between Bayonne Bridge and The Span, stopped traffic back to Bayonne Bridge
8/29/2016 7:31:58 PM
NY-440 - Bridge closed in Area of Staten Island Crossings/Bayonne Br on Dr. Martin Luther King Jr. Expwy (Rt 440)/The Bayonne BR/Staten Island Side SB between The Span and Bayonne Bridge
8/29/2016 9:16:00 PM
NY-52 - Stopped traffic - Closed in Shawangunk on Hwy 52 EB between Oregon Trl/Weed Rd and Burlingham Rd, stopped traffic back to Oregon Trl/Weed Rd
8/29/2016 11:01:54 AM
NY-52 - Closed due to road construction in Walden on Hwy 52 Both EB/WB between Holiday Park Road and Rabbit Run
8/29/2016 9:14:00 PM
NY-52 - Slow traffic - Estimated delay 00:02 - Slow traffic in Pine Bush on Hwy 52 EB between Hwy 302/Maple Ave and CO Hwy 17/Fleury Rd
8/29/2016 8:06:01 PM
NY-52 - Closed due to road construction in Walden on Hwy 52 Both EB/WB between S St Andrews Rd and Valley Avenue
8/28/2016 10:52:12 PM
NY-52 - Closed due to road construction in Ulster on Hwy 52 Both EB/WB between Burlingham Rd and Johns Estate Road
8/29/2016 9:16:00 PM
NY-52 - Stopped traffic - Closed in Shawangunk on Hwy 52 WB between Burlingham Rd and Oregon Trl/Weed Rd, stopped traffic back to Burlingham Rd
8/29/2016 9:16:00 PM
NY-52 - Stopped traffic - Closed in Walden on Hwy 52 WB between CO Hwy 23/Rock Cut Rd and Orange Av, stopped traffic back to CO Hwy 23/Rock Cut Rd
8/29/2016 9:16:00 PM
NY-52 - Stopped traffic - Closed in Walden on Hwy 52 EB between Orange Av and CO Hwy 23/Rock Cut Rd, stopped traffic back to Orange Av
8/29/2016 7:41:44 AM
NY-55 - Closed due to road construction in Lagrangeville on Hwy 55 Both EB/WB between Wisseman Rd and Cunningham Drive
8/29/2016 9:16:00 PM
NY-59 - Slow traffic - Slow traffic in West Nyack on Rt-59 WB between Palisades Interstate Pkwy and Rt-304/S Main St
8/29/2016 9:08:00 PM
NY-59 - Slow traffic - Estimated delay 00:01 - Slow traffic in Rockland on Rt-59 WB between Rt-17 and The NY State Thruway/I-87
8/29/2016 9:16:00 PM
NY-82 - Stopped traffic - Closed in Hopewell Junction on Hwy 82 NB between All Angels Hill Rd and Old Hopewell Rd, stopped traffic back to All Angels Hill Rd
8/29/2016 9:16:00 PM
NY-82 - Stopped traffic - Closed in East Fishkill on Hwy 82 SB between Old Hopewell Rd and All Angels Hill Rd, stopped traffic back to Old Hopewell Rd
8/29/2016 9:10:00 PM
NY-82 - Slow traffic - Estimated delay 00:01 - Slow traffic in Pine Plains on Hwy 82 SB between Hwy 199 and Hwy 199/Church St/Main St
8/29/2016 3:26:33 PM
NY-82 - Closed due to road construction in Hopewell Junction on Hwy 82 Both NB/SB between All Angels Hill Rd and Inky Ln
8/29/2016 9:14:00 PM
NY-9G - Stop and go traffic - Estimated delay 00:03 - Stop and go traffic in Clinton on Hwy 9G SB between CR-14/Hollow Rd/Mills Cross Rd and CR-37/N Cross Rd/Connelly Dr
8/29/2016 9:08:00 PM
New Jersey Tpke - Stopped traffic - Closed in Springfield on NJ Turnpike (From X1 to X8) NB between Burlington-Mt. Holly (#5) and Patp (#6), stopped traffic back to Burlington-Mt. Holly (#5)
8/29/2016 9:08:00 PM
New Jersey Tpke - Stopped traffic - Closed in Springfield on NJ Turnpike (From X1 to X8) NB between Burlington-Mt. Holly (#5) and Patp (#6), stopped traffic back to Burlington-Mt. Holly (#5)
8/29/2016 8:39:57 PM
New Utrecht Ave - Slow traffic - Closed due to accident in Kings on New Utrecht Ave NB north of 53rd Street and Fort Hamilton Pkwy, slow traffic back to 14th Ave
8/29/2016 8:54:20 PM
New Utrecht Ave - Closed due to accident in Kings on New Utrecht Ave SB between Fort Hamilton Pkwy and 53rd Street
8/29/2016 8:39:57 PM
New Utrecht Ave - Slow traffic - Closed due to accident in Kings on New Utrecht Ave NB north of 53rd Street and Fort Hamilton Pkwy, slow traffic back to 14th Ave
8/29/2016 6:48:27 AM
PA-263 - Construction work in Warminster Twp on YORK RD( RT 263) Both NB/SB between Hwy 132/W Street Rd and Almshouse Rd
8/29/2016 9:16:00 PM
PA-263 - Slow traffic - Estimated delay 00:01 - Slow traffic in Doylestown on Rt-263 NB between Edison Furlong Rd/Forest Grove Rd and PA-413
8/29/2016 6:48:34 AM
PA-32 - Closed due to road construction in Solebury Twp on River Rd Both NB/SB between Rt-263/Upper York Rd and Point Pleasant Pike
8/29/2016 9:12:00 PM
PA-63 - Slow traffic - Estimated delay 00:02 - Slow traffic in NE. Philadelphia on Rt-63 WB between US-1/Roosevelt Blvd and US-1/E Roosevelt Blvd
8/28/2016 10:10:24 PM
Park Ave - Bridge closed in Hoboken on Park Ave/Weehawken NB north of 14th St and before Kennedy Blvd
8/28/2016 10:10:24 PM
Park Ave - Bridge work in Weehawken on Park Ave/Weehawken SB south of Kennedy Blvd and before 14th St
8/29/2016 10:06:09 AM
Passyunk Ave - Road construction, roadway reduced to one lane in South Philadelphia on Passyunk Ave WB between 28th St and 61st St
8/29/2016 5:37:52 PM
Pattison Ave - Baseball in Citizens Bank Park on Pattison Ave Both EB/WB at S Darien St
8/29/2016 9:12:50 PM
Queensboro Bridge WB (Lower Level) - Bridge closed in Area of Upper East River Crossings: 59th St/Ed Koch Br Lower/Nyc on The Queensboro/Ed Koch/59th St BR Lower Outer To Queens EB between Manhattan Side and Queens Side
8/28/2016 7:49:32 PM
RI-2 - Road construction, shoulder closed in Warwick on Bald Hill Rd. / Rt. 2 Both NB/SB between Hwy 113/East Ave and I 295 as reported by ridot
8/28/2016 7:49:32 PM
RI-2 - Road construction, right lane closed in East Greenwich on Rt. 2 / South County Trail Both NB/SB over Hwy 4 as reported by ridot
8/28/2016 7:49:32 PM
RI-4 - Road construction, shoulder closed in North Kingstown on Rt 4 Both NB/SB under EX 6 - South County Trail/Rt 2 as reported by ridot
8/28/2016 7:49:32 PM
RI-5 - Road construction, single line traffic-alternate directions in North Smithfield on Rt. 5 / Providence Pike Both NB/SB approaching Main St as reported by ridot
8/29/2016 12:14:00 PM
Richmond St - Closed due to road construction in PORT Richmond on Richmond St SB between Lehigh Ave and Delaware Ave
8/29/2016 9:14:00 PM
Roosevelt Blvd Frontage - Slow traffic - Estimated delay 00:02 - Slow traffic in Philadelphia on Roosevelt Blvd Frontage EB between PA-63/Woodhaven Rd and US 1/Roosevelt Blvd
8/29/2016 9:12:00 PM
Roosevelt Blvd Frontage - Slow traffic - Estimated delay 00:02 - Slow traffic in Philadelphia on Roosevelt Blvd Frontage WB between PA-63/Woodhaven Rd and PA-63/Red Lion Rd
8/29/2016 9:16:00 PM
Roosevelt Blvd Frontage - Slow traffic - Estimated delay 00:01 - Slow traffic in Philadelphia on Roosevelt Blvd Frontage EB between Welsh Rd and Grant Ave
8/29/2016 9:16:00 PM
Roosevelt Blvd Frontage - Slow traffic - Estimated delay 00:01 - Slow traffic in Philadelphia on Roosevelt Blvd Frontage WB between Grant Ave and Welsh Rd
8/29/2016 3:26:33 PM
Saw Mill River Pkwy - On-ramp closed in Dobbs Ferry on Saw Mill River Pkwy NB at Ashford Ave/X17
8/29/2016 3:26:33 PM
Saw Mill River Pkwy - Exit ramp closed in Dobbs Ferry on Saw Mill River Pkwy NB at Ashford Ave/X17
8/29/2016 12:30:00 PM
Spring Garden St - Closed due to major event in Philadelphia on Spring Garden St Both EB/WB between Pennsylvania AVE and Kelly Drive/Ben Franklin Parkway
8/29/2016 9:14:00 PM
Taconic State Pkwy - Slow traffic - Slow traffic in Hawthorne on The Taconic State Pkwy NB between The Sprain Brook Pkwy (NB) and The Saw Mill River Pkwy
8/29/2016 9:10:00 PM
Thiells Mount Ivy Rd - Stopped traffic - Estimated delay 00:01 - Stopped traffic in Rockland on Thiells Mt Ivy Rd SB between Palisades Interstate Pkwy and US 202
8/29/2016 9:07:44 PM
Tuckerton Rd - Accident, traffic being directed around accident area in Shamong on Tuckerton Rd Both EB/WB near US 206
8/29/2016 9:12:00 PM
US-1 - Slow traffic - Estimated delay 00:01 - Slow traffic in NE. Philadelphia on Roosevelt Blvd (NE Philly) SB between Byberry Rd and Red Lion Rd
8/29/2016 9:16:00 PM
US-1 - Slow traffic - Estimated delay 00:01 - Slow traffic in Lawrence on Rt-1 (Bucks/Mercer) NB between US-1/Brunswick Pike and Bakers Basn Rd/Frankln Cornr Rd
8/29/2016 9:16:00 PM
US-1 - Slow traffic - Estimated delay 00:01 - Slow traffic in NE Philadelphia on Roosevelt Blvd (NE Philly) NB between Welsh Rd and Grant Ave
8/29/2016 9:16:00 PM
US-1 - Slow traffic - Slow traffic in South Brunswick on Rt-1/Middlesex Cnty NJ SB between CR-610/Henderson Rd and CR-610/Deans Ln
8/28/2016 7:49:32 PM
US-1 - Road construction, shoulder closed in Narragansett on Rt 1 NB at Woodruff Ave as reported by ridot
8/29/2016 9:16:00 PM
US-1 - Slow traffic - Estimated delay 00:04 - Slow traffic in Guilford on US-1/Post Rd/Ct NB between I 95 (Guilford) and Hwy 146/Boston St
8/29/2016 9:16:00 PM
US-1 - Slow traffic - Estimated delay 00:01 - Slow traffic in NE Philadelphia on Roosevelt Blvd (NE Philly) SB between Grant Ave and Welsh Rd
8/29/2016 9:10:00 PM
US-1 - Slow traffic - Slow traffic in South Brunswick on Rt-1/Middlesex Cnty NJ NB between CR-610/Deans Ln and CR-610/Henderson Rd
8/29/2016 12:15:30 PM
US-1 - Construction work in Morrisville on Rt-1 (Bucks/Mercer) Both NB/SB between Trenton-Morrisville Bridge and Perry St
8/29/2016 9:16:00 PM
US-1 & US-9 - Stopped traffic - Closed in Newark on Rt 1-9 (Including Pulaski Skyway & Covered Rdway/Rt-139) NB between Before Pulsaki Skyway At Roanoke Ave and The Tonnelle Circle, stopped traffic back to Before Pulsaki Skyway At Roanoke Ave
8/29/2016 9:14:00 PM
US-1 & US-9 - Slow traffic - Slow traffic in Rahway on Rt 1-9 (Including Pulaski Skyway & Covered Rdway/Rt-139) NB between Hancock St and CR-13/Grand Ave
8/28/2016 10:10:24 PM
US-1 & US-9 - Ramps closed in Jersey City on Rt 1-9 (Including Pulaski Skyway & Covered Rdway/Rt-139) NB at Pulaski Skyway At Broadway
8/29/2016 9:14:00 PM
US-1 & US-9 - Slow traffic - Slow traffic in Elizabeth on Rt 1-9 (Including Pulaski Skyway & Covered Rdway/Rt-139) NB between North Ave/Nwk Liberty A'Port Service Rd and North Ave/Rt 81/Elizabeth Shopping
8/29/2016 4:22:43 PM
US-1 & US-9 - Ramps closed in Jersey City on Rt 1-9 (Including Pulaski Skyway & Covered Rdway/Rt-139) SB at Pulaski Skyway At Broadway
8/29/2016 8:26:23 PM
US-1 Trk/US-9 Trk - Off-ramp closed in Kearny on Truck Rt 1-9/Hackensack & Passaic River Bridges SB at Central Ave
8/28/2016 10:52:12 PM
US-1 Trk/US-9 Trk - Off-ramp closed in Newark on Truck Rt 1-9/Hackensack & Passaic River Bridges NB at Raymond BL/Njtp/West Of Passiac River BR
8/29/2016 9:10:00 PM
US-13 - Stop and go traffic - Estimated delay 00:01 - Stop and go traffic in Bristol on US-13 SB between Airport Rd and Green Lane
8/29/2016 9:08:00 PM
US-130 - Slow traffic - Estimated delay 00:01 - Slow traffic in Hamilton Twp on US-130/South Jersey SB between I-195 and Crosswicks Hamilton Sqr Rd/Klockner
8/29/2016 9:12:00 PM
US-202 - Stopped traffic - Closed in Bedminster on US-202 NB between US-206 and Mount Harmony Rd, stopped traffic back to US-206
8/29/2016 5:06:07 PM
US-202 - Closed due to road construction in Bernardsville on US-202 SB between Douglass Avenue and Whitenack Rd
8/29/2016 5:06:07 PM
US-202 - Closed due to road construction in Bernardsville on US-202 NB between Whitenack Rd and Douglass Avenue
8/29/2016 9:12:00 PM
US-202 - Stopped traffic - Closed in Bernardsville on US-202 SB between Mount Harmony Rd and US-206, stopped traffic back to Mount Harmony Rd
8/29/2016 9:12:00 PM
US-202 - Stopped traffic - Closed in Bedminster on US-202 NB between US-206 and Mount Harmony Rd, stopped traffic back to US-206
8/29/2016 9:12:00 PM
US-202 - Stopped traffic - Closed in Bernardsville on US-202 SB between Mount Harmony Rd and US-206, stopped traffic back to Mount Harmony Rd
8/29/2016 9:14:00 PM
US-202 - Slow traffic - Estimated delay 00:01 - Slow traffic in Bedminster on US-206 SB between 202/206 Merge And Split/Thosmor Rd and I-287/Schley Mountain Rd
8/29/2016 9:10:00 PM
US-202 - Slow traffic - Slow traffic in Doylestown on US 202 NB between Buckingham Pike/State St and PA-313/Swamp Rd
8/29/2016 9:16:00 PM
US-202 - Slow traffic - Estimated delay 00:01 - Slow traffic in Raritan Twp on Rt-202/Lower Somerset/Hunterdon Cnty NB between CR-611/S Main St and Rt-12/Rt-31
8/29/2016 9:16:00 PM
US-202 - Slow traffic - Estimated delay 00:01 - Slow traffic in Raritan Twp on Rt-202/Lower Somerset/Hunterdon Cnty SB between Church St/Voorhees Corner Rd and Rt-12/Rt-31
8/29/2016 9:14:00 PM
US-22 - Slow traffic - Estimated delay 00:01 - Slow traffic in North Plainfield on Rt-22/NJ EB between North Dr and Terrill Rd
8/29/2016 9:16:00 PM
US-22 - Slow traffic - Estimated delay 00:01 - Slow traffic in Green Brook on Rt-22/NJ EB between CR-651/Warrenville Rd and CR-529/Washington Ave
8/29/2016 9:16:00 PM
US-22 - Slow traffic - Slow traffic in Branchburg on Rt-22/NJ WB between CR-679/Station Rd and CR-637/Readington Rd
8/29/2016 9:16:00 PM
US-22 - Slow traffic - Estimated delay 00:01 - Slow traffic in Philipsburg on US-22 WB between I-78 and CR-519/Saint James Ave/Uniontown Rd
8/29/2016 8:40:39 PM
US-22 - Road construction, right lane closed in Scotch Plains on Rt-22/NJ WB between Westfield Rd and Chimney Rock Rd
8/29/2016 8:40:33 PM
US-22 - Road construction, right lane closed in Bridgewater on Rt-22/NJ EB between Chimney Rock Rd and Westfield Rd
8/29/2016 9:14:00 PM
US-22 - Slow traffic - Estimated delay 00:01 - Slow traffic in Readington on Rt-22/NJ EB between CR-523/Oldwick Rd and Old Route 28
8/29/2016 9:14:00 PM
US-22 - Stop and go traffic - Estimated delay 00:02 - Stop and go traffic in Bridgewater on Rt-22/NJ EB between I-287 and Chimney Rock Rd
8/29/2016 9:16:00 PM
US-30 - Slow traffic - Estimated delay 00:02 - Slow traffic in Berlin on Rt-30 (White Horse Pk) WB between Rt-73 and Cross Keys Rd
8/29/2016 9:16:00 PM
US-30 - Slow traffic - Estimated delay 00:02 - Slow traffic in Berlin on Rt-30 (White Horse Pk) EB between Cross Keys Rd and Rt-73
8/29/2016 1:01:14 PM
US-30 - New road construction layout in Winslow Twp on Rt-30 (White Horse Pk) Both EB/WB between Wiltseys Mill Rd and NJ-143/Spring Garden Rd
8/29/2016 9:14:00 PM
US-322 - Slow traffic - Estimated delay 00:02 - Slow traffic in Hamilton Twp on US-322 EB between CR-575/S Wrangleboro Rd and CR-575/English Creek Ave
8/29/2016 9:16:00 PM
US-322 - Slow traffic - Estimated delay 00:01 - Slow traffic in Egg Harbor Township on US-322 EB between CR-608/W Washington Ave and CR-651/Fire Rd
8/29/2016 9:10:00 PM
US-44 - Slow traffic - Estimated delay 00:01 - Slow traffic in Sussex on US-44 WB between Spring St and State Rt 23
8/29/2016 9:14:00 PM
US-46 - Slow traffic - Estimated delay 00:01 - Slow traffic in Parsippany on Rt-46 (US-46) EB between Cherry Hill Rd/Intervale Rd and US-202/Parsippany Blvd
8/29/2016 9:14:00 PM
US-46 - Slow traffic - Estimated delay 00:02 - Slow traffic in Parsippany on Rt-46 (US-46) WB between Beverwyck Rd and Vail Rd
8/29/2016 9:16:00 PM
US-46 - Slow traffic - Slow traffic in Pine Hill on Rt-46 (US-46) EB between New Rd and Chapin Rd/Hook Mountain Rd
8/29/2016 9:14:00 PM
US-46 - Slow traffic - Estimated delay 00:01 - Slow traffic in Morris on Rt-46 (US-46) WB between Howard Blvd and Rt-10
8/29/2016 9:14:00 PM
US-46 - Slow traffic - Estimated delay 00:02 - Slow traffic in Rockaway on Rt-46 (US-46) WB between Rockaway-Dover Rd and Bergen St/Mt Hope Ave
8/29/2016 9:12:00 PM
US-46 - Stop and go traffic - Estimated delay 00:01 - Stop and go traffic in Parsippany on Rt-46 (US-46) EB between Smith Rd and Vail Rd
8/29/2016 9:16:00 PM
US-5 - Slow traffic - Estimated delay 00:01 - Slow traffic in Meriden on US 5 SB between Hwy 15/Wilbur Cross Pkwy/Canyon Dr and Westfield Rd
8/29/2016 9:16:00 PM
US-5 - Slow traffic - Estimated delay 00:01 - Slow traffic in Enfield on US 5 SB between Old King St and Depot Hill Rd
8/29/2016 8:02:38 PM
US-6 - Construction work in Johnston on Rt 6 Both EB/WB between I-295 and Rt. 10/ 6-10 Connector as reported by ridot
8/29/2016 9:16:00 PM
US-6 - Slow traffic - Estimated delay 00:01 - Slow traffic in Mahopac on RT-6 WB between Miller Rd/Jonathan Dr and Rt-6N/E Main St/Curry St
8/29/2016 9:16:00 PM
US-9 - Slow traffic - Estimated delay 00:01 - Slow traffic in Toms River on US-9 SB between Clayton Ave and Indian Head Rd
8/29/2016 9:10:00 PM
US-9 - Slow traffic - Estimated delay 00:01 - Slow traffic in Wappingers Falls on US-9(Dutchess) NB between Osborne Hill Rd and Middlebush Rd
8/29/2016 9:16:00 PM
US-9 - Slow traffic - Slow traffic in Freehold on US-9 SB between Jackson Mills Rd and CR-524/Elton Adelphia Rd
8/29/2016 9:10:00 PM
US-9 - Stopped traffic - Stopped traffic in Lakewood on US-9 NB between Chestnut Street and Cross Street
8/29/2016 5:01:20 AM
US-9/US-1 - Bridge closed in Newark on Rt 1-9 (Including Pulaski Skyway & Covered Rdway/Rt-139) NB between Pulaski Skyway/Newark Side and The Tonnelle Circle
8/29/2016 2:49:13 PM
US-9W - Road construction, roadway reduced to one lane in Highland Falls on Rt-9W SB between Firefighters Memorial Dr and US 6/US 202
8/29/2016 1:50:28 PM
Verrazano-Narrows Bridge (Upper Level) - Long-term road construction in Richmond on The Verrazano Bridge Upper Level EB between Staten Island Side and Bklyn Side/Gowanus Ramp
8/29/2016 1:50:28 PM
Verrazano-Narrows Bridge (Upper Level) - Long-term road construction in Richmond on The Verrazano Bridge Upper Level WB between Bklyn Side/Belt Ramp and Staten Island Side
8/29/2016 10:02:21 AM
W Sedgley Ave - Closed due to road construction in North Philadelphia on W Sedgley Ave Both EB/WB between W Allegheny Ave and W Erie Ave
8/29/2016 12:15:30 PM
Walnut Ln - Closed due to road construction in Philadelphia on Walnut Ln Both EB/WB between Park Line Dr and Henry Ave as reported by penndot
8/29/2016 12:15:30 PM
Wissinoming St - Construction work in Philadelphia on Wissinoming St WB between I 95/Delaware Ave and Cottman Ave as reported by penndot
8/29/2016 8:16:46 PM
Ct-15 - Road construction, left lane closed in Stamford on Hwy 15 SB between Exit 33 Den Rd and Exit 31 North St
8/29/2016 8:19:30 PM
Ct-15 - Road construction, right lane closed in Stamford on Hwy 15 NB between Exit 33 Den Rd and Exit 36 Rt 106 / Old Stamford Rd
8/29/2016 8:16:46 PM
Ct-8 - Road construction, two lanes closed in Bridgeport on CT - 8/25 Connector NB between Exit 2 Golden Hill St / Main St (N) and Exit 5 Rt 1 / Boston Ave / North Ave
8/29/2016 9:16:00 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Southport on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Exit 23/US 1 and Exit 22/Round Hill Rd (NB)
8/29/2016 8:35:08 PM
I-95 - Stop and go traffic - Estimated delay 00:10 - Road construction, left lane closed in Fairfield on I-95 NB between Exit 23 Rt 1 / Kings Hwy and Exit 25 State St / Commerce Dr (N) / Rt 130 / Fairfield Ave (S), stop and go traffic back to Exit 19 Center St (N) / Rt 1 (S)
8/29/2016 9:14:00 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Bridgeport on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Exit 25/State St/Fairfiled Ave (NB) and Exit 24/Black Rock Pike
8/29/2016 8:35:08 PM
I-95 - Stop and go traffic - Estimated delay 00:10 - Road construction, left lane closed in Fairfield on I-95 NB between Exit 23 Rt 1 / Kings Hwy and Exit 25 State St / Commerce Dr (N) / Rt 130 / Fairfield Ave (S), stop and go traffic back to Exit 19 Center St (N) / Rt 1 (S)
8/29/2016 9:12:00 PM
I-95 - Stop and go traffic - Estimated delay 00:01 - Stop and go traffic in Bridgeport on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) NB between Exit 30/Lordship Blvd/Ct Route 113 (NB) and Exit 30/Surf Ave (SB)
8/29/2016 9:14:00 PM
I-95 - Stop and go traffic - Estimated delay 00:02 - Stop and go traffic in Fairfield: on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Exit 26/Wordin Ave and Exit 25/State St/Fairfiled Ave (NB)
8/29/2016 9:16:00 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Milford on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between School House Rd/Bic Dr/Exit 35 and Fairfield/New Haven County Line (SB)
8/29/2016 9:12:00 PM
I-95 - Stopped traffic - Estimated delay 00:13 - Stopped traffic in Bridgeport on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) NB between Exit 28/East Main St (NB) and Exit 30/Lordship Blvd/Ct Route 113 (NB)
8/29/2016 8:21:30 PM
I-395 - Road construction, left lane closed in Montville on I 395 NB between Exit 9 Rt 2A East and Exit 11/ W Rt 82 / Downtown
8/29/2016 8:11:40 PM
I-395 - Road construction, left lane closed in New London on I 395 NB between Exit 19 Rt 169 (N) and Exit 21/S Rt 12
8/29/2016 8:21:30 PM
I-395 - Road construction, left lane closed in Norwich on I 395 SB between Exit 11/ W Rt 82 / Downtown and Exit 6/ Rt 163
8/29/2016 8:11:40 PM
I-95 - Road construction, right lane closed in East Lyme on I-95 SB between Exit 73 Society Rd and Exit 70 Rt 156 / Lyme St (S)
8/29/2016 9:11:06 PM
I-95 - Closed due to accident in East Lyme on I-95 SB between Exit 74 Rt 161 and Exit 73 Society Rd
8/29/2016 9:14:00 PM
I-95 - Stopped traffic - Estimated delay 00:14 - Stopped traffic in East Lyme on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Exit 73 Society Rd and Rocky Neck Connector/Exit 72
8/29/2016 9:16:00 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Niantic on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Exit 75 Rt 1 and Exit 74 Rt 161
8/29/2016 9:16:00 PM
I-95 - Slow traffic - Estimated delay 00:05 - Slow traffic in East Lyme on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Rocky Neck Connector/Exit 72 and Lyme St/Exit 70 (SB)
8/29/2016 9:12:00 PM
I-95 - Stopped traffic - Estimated delay 00:28 - Stopped traffic in East Lyme on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Exit 74 Rt 161 and Rocky Neck Connector/Exit 72
8/29/2016 9:12:04 PM
NJ-70 - Construction work in Evesham Twp on Rt-70 Both EB/WB between N Cropwell Rd and Rt-38/Kaighn Ave
8/29/2016 9:14:00 PM
NJ-73 - Slow traffic - Estimated delay 00:03 - Slow traffic in Berlin Twp on Rt-73 NB between CR-675/Cooper Rd and Evesham Rd
8/29/2016 9:08:00 PM
New Jersey Tpke - Stopped traffic - Closed in Springfield on NJ Turnpike (From X1 to X8) NB between Burlington-Mt. Holly (#5) and Patp (#6), stopped traffic back to Burlington-Mt. Holly (#5)
8/29/2016 9:08:00 PM
New Jersey Tpke - Stopped traffic - Closed in Springfield on NJ Turnpike (From X1 to X8) NB between Burlington-Mt. Holly (#5) and Patp (#6), stopped traffic back to Burlington-Mt. Holly (#5)
8/29/2016 9:07:44 PM
Tuckerton Rd - Accident, traffic being directed around accident area in Shamong on Tuckerton Rd Both EB/WB near US 206
8/29/2016 4:55:46 AM
Bridge & tunnel information in 1A. Hudson River Crossings - call tips to 212-377-7757
8/29/2016 9:16:00 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Hudson on New Jersey Tpke SB between X17/Rt-3/Lincoln Tunnel/I-495 (SB) and I-495/Lincoln Tunnel Ramps
8/29/2016 9:10:00 PM
I-95 - Stop and go traffic - Stop and go traffic in Secaucus on New Jersey Tpke SB between I-495/Lincoln Tunnel Ramps and X16e/18e/Lincoln Tunnel/I-495
8/29/2016 7:31:43 PM
NJ-440 - Bridge closed in Staten Island on Rt 440/Jersey City/Bayonne/Bayonne BR/NJ Side SB between Bayonne Brg and Mid-Span
8/29/2016 9:16:00 PM
NJ-440 - Stopped traffic - Closed in Hudson on Rt 440/Jersey City/Bayonne/Bayonne BR/NJ Side NB between Mid-Span and Kennedy Blvd/Avenue A, stopped traffic back to Mid-Span
8/29/2016 9:16:00 PM
NJ-440 - Stopped traffic - Closed in Bayonne on Rt 440/Jersey City/Bayonne/Bayonne BR/NJ Side NB between Kennedy Blvd/Avenue A and Bayonne Brg, stopped traffic back to Kennedy Blvd/Avenue A
8/28/2016 10:10:24 PM
Park Ave - Bridge work in Weehawken on Park Ave/Weehawken SB south of Kennedy Blvd and before 14th St
8/28/2016 10:10:24 PM
Park Ave - Bridge closed in Hoboken on Park Ave/Weehawken NB north of 14th St and before Kennedy Blvd
8/28/2016 10:10:24 PM
US-1 & US-9 - Ramps closed in Jersey City on Rt 1-9 (Including Pulaski Skyway & Covered Rdway/Rt-139) NB at Pulaski Skyway At Broadway
8/29/2016 4:22:43 PM
US-1 & US-9 - Ramps closed in Jersey City on Rt 1-9 (Including Pulaski Skyway & Covered Rdway/Rt-139) SB at Pulaski Skyway At Broadway
8/29/2016 9:16:00 PM
US-1 & US-9 - Stopped traffic - Closed in Newark on Rt 1-9 (Including Pulaski Skyway & Covered Rdway/Rt-139) NB between Before Pulsaki Skyway At Roanoke Ave and The Tonnelle Circle, stopped traffic back to Before Pulsaki Skyway At Roanoke Ave
8/29/2016 8:26:23 PM
US-1 Trk/US-9 Trk - Off-ramp closed in Kearny on Truck Rt 1-9/Hackensack & Passaic River Bridges SB at Central Ave
8/29/2016 7:31:58 PM
NJ-440 - Bridge closed in Bayonne on Rt 440/Jersey City/Bayonne/Bayonne BR/NJ Side NB between Mid-Span and Bayonne Brg
8/29/2016 9:16:00 PM
NJ-440 - Stopped traffic - Closed in Area of Staten Island Xings/Bayonne Bridge NJ on Rt 440/Jersey City/Bayonne/Bayonne BR/NJ Side SB between Bayonne Brg and Mid-Span, stopped traffic back to Bayonne Brg
8/29/2016 7:31:58 PM
NY-440 - Bridge closed in Staten Island on Dr. Martin Luther King Jr. Expwy (Rt 440)/The Bayonne BR/Staten Island Side NB between Bayonne Bridge and The Span
8/29/2016 7:31:58 PM
NY-440 - Bridge closed in Area of Staten Island Crossings/Bayonne Br on Dr. Martin Luther King Jr. Expwy (Rt 440)/The Bayonne BR/Staten Island Side SB between The Span and Bayonne Bridge
8/29/2016 11:55:18 AM
NY-440 - Ramps closed in Staten Island on Dr. Martin Luther King Jr Xpwy/440 NB at Morningstar Rd/Exit 13
8/29/2016 9:14:44 PM
NY-440 - Accident cleared in Staten Island on The West Shore Xpwy/Rt-440 SB at Bloomingdale Rd/X3 (SB)
8/29/2016 9:16:00 PM
NY-440 - Stopped traffic - Closed in Area of Staten Island Crossings/Bayonne Br on Bayonne Brg NB between Bayonne Bridge and The Span, stopped traffic back to Bayonne Bridge
8/29/2016 9:16:00 PM
NY-440 - Stopped traffic - Closed in Area of Staten Island Crossings/Bayonne Br on Bayonne Brg SB between The Span and Rt-440/Dr Martin Luther King Jr Expy, stopped traffic back to The Span
8/29/2016 9:16:00 PM
NY-440 - Stopped traffic - Closed in Area of Staten Island Crossings/Bayonne Br on Bayonne Brg SB between Rt-440/Dr Martin Luther King Jr Expy and Bayonne Bridge, stopped traffic back to Rt-440/Dr Martin Luther King Jr Expy
8/29/2016 1:50:28 PM
Verrazano-Narrows Bridge (Upper Level) - Long-term road construction in Richmond on The Verrazano Bridge Upper Level EB between Staten Island Side and Bklyn Side/Gowanus Ramp
8/29/2016 8:52:52 PM
NY-17K - Closed due to accident in Montgomery on Hwy 17k Both EB/WB between Bracken Rd and CO Hwy 75/Coldenham Rd
8/29/2016 9:08:00 PM
NY-32 - Slow traffic - Estimated delay 00:03 - Slow traffic in Newburgh on Hwy 32 NB between CO Hwy 69/Union Ave and US 9W/Hwy 17k/Robinson Ave/Broadway
8/29/2016 9:16:00 PM
NY-42 - Stopped traffic - Closed in Deerpark on Hwy 42 NB between Hwy 97 and Whitehead Rd, stopped traffic back to Hwy 97
8/29/2016 11:45:40 AM
NY-42 - Closed due to road construction in Sparrow Bush on Hwy 42 Both NB/SB between Cahoonzie rd and Bolton Basin Rd
8/29/2016 9:16:00 PM
NY-42 - Stopped traffic - Closed in Deerpark on Hwy 42 SB between Whitehead Rd and Hwy 97, stopped traffic back to Whitehead Rd
8/29/2016 11:01:54 AM
NY-52 - Closed due to road construction in Walden on Hwy 52 Both EB/WB between Holiday Park Road and Rabbit Run
8/29/2016 8:06:01 PM
NY-52 - Closed due to road construction in Walden on Hwy 52 Both EB/WB between S St Andrews Rd and Valley Avenue
8/29/2016 9:14:00 PM
NY-52 - Slow traffic - Estimated delay 00:02 - Slow traffic in Pine Bush on Hwy 52 EB between Hwy 302/Maple Ave and CO Hwy 17/Fleury Rd
8/29/2016 9:16:00 PM
NY-52 - Stopped traffic - Closed in Walden on Hwy 52 WB between CO Hwy 23/Rock Cut Rd and Orange Av, stopped traffic back to CO Hwy 23/Rock Cut Rd
8/29/2016 9:16:00 PM
NY-52 - Stopped traffic - Closed in Walden on Hwy 52 EB between Orange Av and CO Hwy 23/Rock Cut Rd, stopped traffic back to Orange Av
8/29/2016 2:49:13 PM
US-9W - Road construction, roadway reduced to one lane in Highland Falls on Rt-9W SB between Firefighters Memorial Dr and US 6/US 202
8/29/2016 1:33:30 AM
NY-212 - Closed due to road construction in Ulster on NY-212 Both EB/WB between CR-45/Wittenberg Rd and Grogkill Road
8/29/2016 11:02:00 AM
NY-213 - Construction work in Kingston on NY-213 Both EB/WB between Canal St and New Salem Road
8/29/2016 9:12:00 PM
NY-213 - Slow traffic - Estimated delay 00:01 - Slow traffic in Ulster on NY-213 WB between CR-28/Mountain Rd and CR-24/Union Center Rd
8/29/2016 9:16:00 PM
NY-52 - Stopped traffic - Closed in Shawangunk on Hwy 52 WB between Burlingham Rd and Oregon Trl/Weed Rd, stopped traffic back to Burlingham Rd
8/28/2016 10:52:12 PM
NY-52 - Closed due to road construction in Ulster on Hwy 52 Both EB/WB between Burlingham Rd and Johns Estate Road
8/29/2016 9:16:00 PM
NY-52 - Stopped traffic - Closed in Shawangunk on Hwy 52 EB between Oregon Trl/Weed Rd and Burlingham Rd, stopped traffic back to Oregon Trl/Weed Rd
8/29/2016 9:10:00 PM
US-44 - Slow traffic - Estimated delay 00:01 - Slow traffic in Sussex on US-44 WB between Spring St and State Rt 23
8/29/2016 9:10:00 PM
NY-199 - Slow traffic - Estimated delay 00:01 - Slow traffic in Pine Plains on NY-199 WB between NY-82 and NY-82/CR-83A/Main St
8/29/2016 7:41:44 AM
NY-55 - Closed due to road construction in Lagrangeville on Hwy 55 Both EB/WB between Wisseman Rd and Cunningham Drive
8/29/2016 3:26:33 PM
NY-82 - Closed due to road construction in Hopewell Junction on Hwy 82 Both NB/SB between All Angels Hill Rd and Inky Ln
8/29/2016 9:16:00 PM
NY-82 - Stopped traffic - Closed in East Fishkill on Hwy 82 SB between Old Hopewell Rd and All Angels Hill Rd, stopped traffic back to Old Hopewell Rd
8/29/2016 9:10:00 PM
NY-82 - Slow traffic - Estimated delay 00:01 - Slow traffic in Pine Plains on Hwy 82 SB between Hwy 199 and Hwy 199/Church St/Main St
8/29/2016 9:16:00 PM
NY-82 - Stopped traffic - Closed in Hopewell Junction on Hwy 82 NB between All Angels Hill Rd and Old Hopewell Rd, stopped traffic back to All Angels Hill Rd
8/29/2016 9:14:00 PM
NY-9G - Stop and go traffic - Estimated delay 00:03 - Stop and go traffic in Clinton on Hwy 9G SB between CR-14/Hollow Rd/Mills Cross Rd and CR-37/N Cross Rd/Connelly Dr
8/29/2016 9:10:00 PM
US-9 - Slow traffic - Estimated delay 00:01 - Slow traffic in Wappingers Falls on US-9(Dutchess) NB between Osborne Hill Rd and Middlebush Rd
8/29/2016 9:08:00 PM
NY-59 - Slow traffic - Estimated delay 00:01 - Slow traffic in Rockland on Rt-59 WB between Rt-17 and The NY State Thruway/I-87
8/29/2016 9:16:00 PM
NY-59 - Slow traffic - Slow traffic in West Nyack on Rt-59 WB between Palisades Interstate Pkwy and Rt-304/S Main St
8/29/2016 9:10:00 PM
Thiells Mount Ivy Rd - Stopped traffic - Estimated delay 00:01 - Stopped traffic in Rockland on Thiells Mt Ivy Rd SB between Palisades Interstate Pkwy and US 202
8/29/2016 5:01:16 AM
CR-518 - Closed due to road construction in Kendall Park on Rt 518 WB between Hwy 27/Lincoln Hwy and Crescent Ave
8/29/2016 5:01:16 AM
CR-518 - Closed due to road construction in Rocky Hill on Rt 518 EB between Crescent Ave and Hwy 27/Lincoln Hwy
8/29/2016 9:12:00 PM
US-202 - Stopped traffic - Closed in Bedminster on US-202 NB between US-206 and Mount Harmony Rd, stopped traffic back to US-206
8/29/2016 9:12:00 PM
US-202 - Stopped traffic - Closed in Bernardsville on US-202 SB between Mount Harmony Rd and US-206, stopped traffic back to Mount Harmony Rd
8/29/2016 9:12:00 PM
US-202 - Stopped traffic - Closed in Bedminster on US-202 NB between US-206 and Mount Harmony Rd, stopped traffic back to US-206
8/29/2016 5:06:07 PM
US-202 - Closed due to road construction in Bernardsville on US-202 SB between Douglass Avenue and Whitenack Rd
8/29/2016 9:12:00 PM
US-202 - Stopped traffic - Closed in Bernardsville on US-202 SB between Mount Harmony Rd and US-206, stopped traffic back to Mount Harmony Rd
8/29/2016 9:14:00 PM
US-202 - Slow traffic - Estimated delay 00:01 - Slow traffic in Bedminster on US-206 SB between 202/206 Merge And Split/Thosmor Rd and I-287/Schley Mountain Rd
8/29/2016 5:06:07 PM
US-202 - Closed due to road construction in Bernardsville on US-202 NB between Whitenack Rd and Douglass Avenue
8/29/2016 8:40:33 PM
US-22 - Road construction, right lane closed in Bridgewater on Rt-22/NJ EB between Chimney Rock Rd and Westfield Rd
8/29/2016 9:16:00 PM
US-22 - Slow traffic - Slow traffic in Branchburg on Rt-22/NJ WB between CR-679/Station Rd and CR-637/Readington Rd
8/29/2016 9:14:00 PM
US-22 - Stop and go traffic - Estimated delay 00:02 - Stop and go traffic in Bridgewater on Rt-22/NJ EB between I-287 and Chimney Rock Rd
8/29/2016 9:16:00 PM
US-22 - Slow traffic - Estimated delay 00:01 - Slow traffic in Green Brook on Rt-22/NJ EB between CR-651/Warrenville Rd and CR-529/Washington Ave
8/29/2016 9:14:00 PM
US-22 - Slow traffic - Estimated delay 00:01 - Slow traffic in North Plainfield on Rt-22/NJ EB between North Dr and Terrill Rd
8/29/2016 9:14:00 PM
Atlantic City Expy - Stop and go traffic - Stop and go traffic in Atlantic City on Atlantic City Expy EB between Expy Connector/N Missourri Ave/N Arkansas Ave/Baltic Ave and Baltic Ave/Fairmount Ave
8/29/2016 8:53:47 PM
Atlantic City Expy - Slow traffic - Estimated delay 00:03 - Incident cleared in Hamilton Twp on Atlantic City Expy EB at Exit 14/Atlantic City Race Track, slow traffic back to Exit 17/Rt-50/Egg Harbor/Mays Landing
8/29/2016 8:53:47 PM
Atlantic City Expy - Slow traffic - Estimated delay 00:03 - Incident cleared in Hamilton Twp on Atlantic City Expy EB at Exit 14/Atlantic City Race Track, slow traffic back to Exit 17/Rt-50/Egg Harbor/Mays Landing
8/29/2016 9:16:00 PM
CR-563 - Slow traffic - Estimated delay 00:01 - Slow traffic in Atlantic on Tilton Rd SB between US 322/US 40/Uibel Ave and US 322/US 40/Black Horse Pike (Egg Harbor Township) (North)
8/29/2016 9:14:00 PM
CR-575 - Slow traffic - Estimated delay 00:03 - Slow traffic in Egg Harbor Twp on CR-575 SB between Atlantic City Expressway and US 322/US 40/Black Horse Pike
8/29/2016 9:14:00 PM
US-322 - Slow traffic - Estimated delay 00:02 - Slow traffic in Hamilton Twp on US-322 EB between CR-575/S Wrangleboro Rd and CR-575/English Creek Ave
8/29/2016 9:16:00 PM
US-322 - Slow traffic - Estimated delay 00:01 - Slow traffic in Egg Harbor Township on US-322 EB between CR-608/W Washington Ave and CR-651/Fire Rd
8/29/2016 9:14:00 PM
CR-523 - Stop and go traffic - Stop and go traffic in Readington on CO Hwy 523 SB between US 22 and US 22/Old Highway 28
8/29/2016 9:10:00 PM
CR-626 - Slow traffic - Slow traffic in Hunterdon on CO Hwy 626 WB between US 22 and Hwy 31
8/29/2016 8:06:55 PM
I-78 - Road construction, two lanes closed in Bethlehem Twp on I-78 WB near NJ-173/Exit 7 and before Bloomsbury Rd/Exit 6
8/29/2016 9:14:00 PM
NJ-31 - Slow traffic - Estimated delay 00:01 - Slow traffic in Clinton on Rt-31 SB between I 78 and Regional Rd
8/29/2016 9:12:00 PM
NJ-31 - Slow traffic - Estimated delay 00:01 - Slow traffic in Flemington on Rt-31 NB between Main St (Flemington) (South) and US 202/New Jersey Route 12
8/29/2016 9:16:00 PM
US-202 - Slow traffic - Estimated delay 00:01 - Slow traffic in Raritan Twp on Rt-202/Lower Somerset/Hunterdon Cnty SB between Church St/Voorhees Corner Rd and Rt-12/Rt-31
8/29/2016 9:16:00 PM
US-202 - Slow traffic - Estimated delay 00:01 - Slow traffic in Raritan Twp on Rt-202/Lower Somerset/Hunterdon Cnty NB between CR-611/S Main St and Rt-12/Rt-31
8/29/2016 9:14:00 PM
US-22 - Slow traffic - Estimated delay 00:01 - Slow traffic in Readington on Rt-22/NJ EB between CR-523/Oldwick Rd and Old Route 28
8/29/2016 7:51:49 PM
Eagle Rock Ave - Closed due to road construction in Roseland on Eagle Rock Ave WB between Laurel Ave and Baldwin Ct
8/29/2016 7:51:49 PM
Eagle Rock Ave - Closed due to road construction in Roseland on Eagle Rock Ave EB between Baldwin Ct and Laurel Ave
8/29/2016 9:14:00 PM
Garden State Pkwy - Slow traffic - Estimated delay 00:03 - Slow traffic in East Orange on Garden State Parkway NB between X147/Walnut St and X148/Bloomfield Ave
8/29/2016 9:14:00 PM
Garden State Pkwy - Stop and go traffic - Estimated delay 00:06 - Stop and go traffic in East Orange on Garden State Parkway NB between X145/I-280 and X147/Walnut St
8/29/2016 9:14:00 PM
Garden State Pkwy - Stop and go traffic - Estimated delay 00:01 - Stop and go traffic in Bloomfield on The Garden State Pkwy NB between X148/Bloomfield Ave and X149/Belleville Ave
8/29/2016 7:56:45 PM
I-95 (Car Only) - Closed due to road construction in Newark on NJ Turnpike Car Lanes/Inner Rdwy SB from x15E/Truck Rt 1-9/Raymond Blvd to X9-Rt-18
8/29/2016 8:05:50 PM
NJ-21 - Construction work in Newark on Rt-21 SB between Clay St and Bridge St
8/29/2016 8:05:50 PM
NJ-21 - Construction work in Newark on Rt-21 NB between Bridge St and Clay St
8/28/2016 10:52:12 PM
US-1 Trk/US-9 Trk - Off-ramp closed in Newark on Truck Rt 1-9/Hackensack & Passaic River Bridges NB at Raymond BL/Njtp/West Of Passiac River BR
8/29/2016 5:01:20 AM
US-9/US-1 - Bridge closed in Newark on Rt 1-9 (Including Pulaski Skyway & Covered Rdway/Rt-139) NB between Pulaski Skyway/Newark Side and The Tonnelle Circle
8/29/2016 8:54:20 PM
46th Street - Closed in Kings on 46th Street EB between 11th Avenue and 12th Avenue
8/29/2016 5:36:06 PM
5th Avenue - Closed due to road construction in Bklyn on 5th Avenue SB between 64th Street and 65th St
8/29/2016 5:36:06 PM
5th Avenue - Closed due to road construction in Bklyn on 5th Avenue NB between 65th St and 64th Street
8/29/2016 8:13:58 PM
Brooklyn Battery Tunnel - Road construction, roadway reduced to one lane in Bklyn on The Hugh Carey Battery Tunnel WB between The Tolls and Trinity Pl/West Side Hwy
8/29/2016 9:14:00 PM
I-278 - Slow traffic - Estimated delay 00:01 - Slow traffic in Bklyn: On the B.Q.E. on I-278 EB between Atlantic Ave/x27 and Cadman Plaza/x28A (EB)
8/29/2016 9:12:00 PM
I-278 - Stop and go traffic - Estimated delay 00:07 - Stop and go traffic in Bklyn: On The B.Q.E. on I-278 EB between The Williamsburg Br/Metropolitan Ave/x32 (EB) and McGuiness Blvd/Humboldt St/x33 (EB)
8/29/2016 9:10:00 PM
Leif Ericson Dr/Belt Pkwy/Shore Pkwy - Stop and go traffic - Estimated delay 00:06 - Stop and go traffic in Bklyn on Belt Pkwy WB between Bay Pkwy/x5 and Verrazano BR/X3
8/29/2016 8:39:57 PM
New Utrecht Ave - Slow traffic - Closed due to accident in Kings on New Utrecht Ave NB north of 53rd Street and Fort Hamilton Pkwy, slow traffic back to 14th Ave
8/29/2016 8:54:20 PM
New Utrecht Ave - Closed due to accident in Kings on New Utrecht Ave SB between Fort Hamilton Pkwy and 53rd Street
8/29/2016 8:39:57 PM
New Utrecht Ave - Slow traffic - Closed due to accident in Kings on New Utrecht Ave NB north of 53rd Street and Fort Hamilton Pkwy, slow traffic back to 14th Ave
8/29/2016 1:50:28 PM
Verrazano-Narrows Bridge (Upper Level) - Long-term road construction in Richmond on The Verrazano Bridge Upper Level WB between Bklyn Side/Belt Ramp and Staten Island Side
8/29/2016 9:14:44 PM
I-678 - Stop and go traffic - Estimated delay 00:06 - Stop and go traffic in Queens: On The Van Wyck Exwy on I-678 (Van Wyck/Whitestone) NB between Rockaway Blvd/X2 and Queens BL/NY Rt-25 /X9 (NB)
8/29/2016 9:12:00 PM
I-678 - Slow traffic - Slow traffic in Queens: On The Van Wyck Expwy on I-678 (Van Wyck/Whitestone) SB between The Grand Central Pkwy/Kew Gardens Interchange (NB)/X10 and Main St/X8 (NB)
8/29/2016 1:50:28 PM
La Guardia Arpt Entrance - Closed due to road construction in Queens on La Guardia Arpt Entrance NB between Ditmars Boulevard and LaGuardia Road
8/29/2016 8:45:20 PM
Leif Ericson Dr/Belt Pkwy/Shore Pkwy - Slow traffic - Estimated delay 00:01 - Slow traffic in Queens: On The Belt Pkwy on Belt Pkwy EB between Farmers Blvd/X21b and Francis Lewis Blvd/X24a
8/29/2016 9:14:44 PM
I-678 - Stop and go traffic - Estimated delay 00:04 - Stop and go traffic in Bronx on I-678 (Van Wyck/Whitestone) SB between North Of Whitesone BR South Of I-95/Cross Bronx and 3rd Ave/The Whitestone Bridge/Queens Side
8/28/2016 10:31:12 PM
I-87 - Long-term road construction in The Bronx: On The Major Deegan Expwy on I-87 (Deegan/Thruway) NB between 138th St/Grand Concourse/3rd Ave/X3 and Cross Bronx/GWB Ramps/x7
8/29/2016 8:54:20 PM
I-95 - Stop and go traffic - Estimated delay 00:08 - Stop and go traffic in The Bronx: On The Cross Bronx Expressway on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between White Plains Rd/Westchester Ave (x5A) and The Alexander Hamilton Bridge
8/29/2016 9:10:00 PM
I-80 - Stop and go traffic - Estimated delay 00:03 - Stop and go traffic in Woodland Park on I-80 EB between X56/Squirrelwood Rd and x57/Rt-19/Main St
8/29/2016 9:16:00 PM
NJ-20 - Stop and go traffic - Estimated delay 00:02 - Stop and go traffic in Fair Lawn on Rt. 20 SB between Hwy 208 and 5th Ave
8/29/2016 4:28:38 AM
Ct-2 - Ramps closed in East Hartford on Rt 2 WB at The Founders Bridge
8/29/2016 9:14:00 PM
Ct-3 - Slow traffic - Slow traffic in Wethersfield on Hwy 3 NB between Elm St and I 91
8/29/2016 7:20:19 PM
Ct-72 - Road construction, right lane closed in New Britain on Ct-72 EB between Ct-372/Corbin Ave/Exit 7 and Columbus Blvd
8/29/2016 4:28:50 AM
I-84 - Long-term road construction in Plainville on I 84 EB between Exit 33 Rt 72 West and Exit 36 Slater Rd
8/29/2016 8:16:46 PM
I-84 - Road construction, two lanes closed in Farmington on I 84 EB between Exit 37 Fienemann Rd and Exit 39 Rt 4
8/29/2016 8:16:46 PM
I-91 - Road construction, left lane closed in Enfield on I 91 SB between Exit 47e/W Rt 190 East & West and Exit 46 Rt 5 / King St
8/29/2016 8:16:46 PM
I-91 - Road construction, left lane closed in Enfield on I 91 NB between Exit 47e/W Rt 190 East & West and Exit 48 Rt 220 / Elm St
8/29/2016 9:12:00 PM
I-91 - Slow traffic - Slow traffic in Hartford on I 91 SB between Exit 27 Airport Rd / Brainard Rd (N) and US 5/Hwy 15/Exit 28
8/29/2016 9:12:00 PM
I-91 - Stop and go traffic - Estimated delay 00:02 - Stop and go traffic in Hartford on I 91 SB between US 5/Exit 29 and Exit 27 Airport Rd / Brainard Rd (N)
8/29/2016 9:16:00 PM
US-5 - Slow traffic - Estimated delay 00:01 - Slow traffic in Enfield on US 5 SB between Old King St and Depot Hill Rd
8/29/2016 9:10:00 PM
NY-17 - Stop and go traffic - Estimated delay 00:02 - Stop and go traffic in Sullivan on Hwy 17 EB between NY-52/Exit 100 and CR-175/Exit 101
8/29/2016 6:48:27 AM
PA-263 - Construction work in Warminster Twp on YORK RD( RT 263) Both NB/SB between Hwy 132/W Street Rd and Almshouse Rd
8/29/2016 9:16:00 PM
PA-263 - Slow traffic - Estimated delay 00:01 - Slow traffic in Doylestown on Rt-263 NB between Edison Furlong Rd/Forest Grove Rd and PA-413
8/29/2016 6:48:34 AM
PA-32 - Closed due to road construction in Solebury Twp on River Rd Both NB/SB between Rt-263/Upper York Rd and Point Pleasant Pike
8/29/2016 12:15:30 PM
US-1 - Construction work in Morrisville on Rt-1 (Bucks/Mercer) Both NB/SB between Trenton-Morrisville Bridge and Perry St
8/29/2016 9:10:00 PM
US-13 - Stop and go traffic - Estimated delay 00:01 - Stop and go traffic in Bristol on US-13 SB between Airport Rd and Green Lane
8/29/2016 9:10:00 PM
US-202 - Slow traffic - Slow traffic in Doylestown on US 202 NB between Buckingham Pike/State St and PA-313/Swamp Rd
8/29/2016 9:12:00 PM
NJ-183 - Slow traffic - Estimated delay 00:01 - Slow traffic in Netcong/Morris County on NJ-183 NB between I-80 and US-46/Ledgewood Ave
8/29/2016 9:14:00 PM
US-46 - Slow traffic - Estimated delay 00:02 - Slow traffic in Rockaway on Rt-46 (US-46) WB between Rockaway-Dover Rd and Bergen St/Mt Hope Ave
8/29/2016 9:14:00 PM
US-46 - Slow traffic - Estimated delay 00:01 - Slow traffic in Morris on Rt-46 (US-46) WB between Howard Blvd and Rt-10
8/29/2016 9:14:00 PM
US-46 - Slow traffic - Estimated delay 00:02 - Slow traffic in Parsippany on Rt-46 (US-46) WB between Beverwyck Rd and Vail Rd
8/29/2016 9:16:00 PM
US-46 - Slow traffic - Slow traffic in Pine Hill on Rt-46 (US-46) EB between New Rd and Chapin Rd/Hook Mountain Rd
8/29/2016 9:14:00 PM
US-46 - Slow traffic - Estimated delay 00:01 - Slow traffic in Parsippany on Rt-46 (US-46) EB between Cherry Hill Rd/Intervale Rd and US-202/Parsippany Blvd
8/29/2016 9:12:00 PM
US-46 - Stop and go traffic - Estimated delay 00:01 - Stop and go traffic in Parsippany on Rt-46 (US-46) EB between Smith Rd and Vail Rd
8/29/2016 9:12:00 PM
9th St/Central Ave/Lakewood Farmingdale Rd/Asbury Ave/Lakehurst-Whitesville Rd/Asbury Rd - Slow traffic - Estimated delay 00:02 - Slow traffic in Farmingdale on Asbury Ave/Asbury Rd/Central Ave/Hope Chapel Rd/Lakewood Farmingdale Rd/Madison Ave/Ridgeway Blvd/RI SB between Tinton Falls Rd and Main St
8/29/2016 5:17:13 AM
Laurel Ave - Bridge closed in Holmdel on Laurel Ave Both NB/SB between Holland Road and Hwy 35
8/29/2016 9:16:00 PM
US-9 - Slow traffic - Slow traffic in Freehold on US-9 SB between Jackson Mills Rd and CR-524/Elton Adelphia Rd
8/29/2016 9:14:00 PM
Chevalier Ave - Slow traffic - Slow traffic in Middlesex on Chevalier Ave EB between Garden State Pkwy and US 9/Hwy 35
8/29/2016 8:54:05 PM
Garden State Pkwy - Road construction, two lanes closed in Middlesex on The Garden State Pkwy SB between The Raritan Tolls (SB) and Cheesequake Park
8/29/2016 8:29:03 PM
Garden State Pkwy - Road construction, two lanes closed in Sayreville on The Garden State Pkwy NB between X123/Rt-9 and before The Driscoll Bridge
8/29/2016 7:57:02 PM
I-95 (Car Only) - Closed due to road construction in Cranbury Twp on NJ Turnpike Car Lanes/Inner Rdwy NB between Mercer--Middlesex County Border and x15E/Truck Rt 1-9/Raymond Blvd
8/29/2016 3:11:34 PM
NJ-35 - Construction work in Woodbridge on Rt-35 SB between CR-656/Smith St and Rt-35/Victory Brg
8/29/2016 3:11:28 PM
NJ-35 - Construction work in Sayreville on Rt-35 NB between Rt-35/Victory Brg and CR-656/Smith St
8/28/2016 9:38:09 PM
NJ-440 - Ramp restrictions in Perth Amboy on Rt-440/Middlesex Cnty SB at Rt-35/Rt-184/Pfeiffer Blvd
8/29/2016 9:10:00 PM
US-1 - Slow traffic - Slow traffic in South Brunswick on Rt-1/Middlesex Cnty NJ NB between CR-610/Deans Ln and CR-610/Henderson Rd
8/29/2016 9:16:00 PM
US-1 - Slow traffic - Slow traffic in South Brunswick on Rt-1/Middlesex Cnty NJ SB between CR-610/Henderson Rd and CR-610/Deans Ln
8/29/2016 9:10:00 PM
Garden State Pkwy - Slow traffic - Slow traffic in Washington on The Garden State Pkwy SB between Hillsdale/Pascack Valley Tolls and X166/Linwood Ave
8/29/2016 8:30:07 PM
Garden State Pkwy - Road construction, right lane closed in Saddle Brook Township on The Garden State Pkwy NB between The Bergen Tolls (NB) and before X165/Ridgewood Ave
8/29/2016 8:05:43 PM
I-80 - Road construction, two lanes closed in Bergen on I-80 EB between x62B/Saddle River Rd and x63/Riverview Ave
8/29/2016 9:14:00 PM
I-495 Frontage/Service Rd - Slow traffic - Estimated delay 00:01 - Slow traffic in Medford on L.I.E Service Road WB between Horseblock Rd and I 495/Hwy 112/Medford Ave
8/29/2016 8:23:17 PM
I-287/I-87 - Road construction, two lanes closed in Tarrytown on The NY State Thruway (I-87/287/Tapp) NB between Thruway/Cross Westchester/I-87/I-287 Split/Merge and The Tappan Zee Bridge Span
8/29/2016 9:10:00 PM
I-684 - Slow traffic - Estimated delay 00:01 - Slow traffic in Purdys on I-684 SB between NY Rt-116/X7 (NB) and NY Rt-138/Goldens Bridge Rd/X6a (SB)
8/29/2016 7:53:41 PM
I-87 - Road construction, left lane closed in Ardsley on I-87 (Deegan/Thruway) SB between Saw Mill River Pkwy/x7A and Saw Mill River Rd/x7
8/29/2016 11:02:00 AM
I-87 - Road construction, left lane closed in Ardsley on I-87 (Deegan/Thruway) NB between Saw Mill River Rd/x7 and Saw Mill River Pkwy/x7A
8/29/2016 7:52:10 PM
I-95 - Slow moving maintenance vehicle, right lane closed in Port Chester on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) SB between Cross Westchester Expressway/I-287/X21 and North Ave/Cedar St/X16
8/29/2016 7:47:36 PM
I-95 - Road construction, left lane closed in New Rochelle: On The New England Thruway on I-95 (Cross Bx/Bruckner/N.E.T./Ct Tpk) NB between Boston Rd/US-1/X15 and North Ave/Cedar St/X16
8/29/2016 9:16:00 PM
NY-22 - Slow traffic - Slow traffic in Armonk on Rt-22/NY SB between Rt-120/King St/Whippoorwill Rd and Rt-120/King St
8/29/2016 9:14:00 PM
NY-22 - Slow traffic - Slow traffic in Armonk on Rt-22/NY SB between Greenwich Rd and I-684
8/29/2016 3:26:33 PM
Saw Mill River Pkwy - On-ramp closed in Dobbs Ferry on Saw Mill River Pkwy NB at Ashford Ave/X17
8/29/2016 3:26:33 PM
Saw Mill River Pkwy - Exit ramp closed in Dobbs Ferry on Saw Mill River Pkwy NB at Ashford Ave/X17
8/29/2016 9:14:00 PM
Taconic State Pkwy - Slow traffic - Slow traffic in Hawthorne on The Taconic State Pkwy NB between The Sprain Brook Pkwy (NB) and The Saw Mill River Pkwy
8/29/2016 9:16:00 PM
US-6 - Slow traffic - Estimated delay 00:01 - Slow traffic in Mahopac on RT-6 WB between Miller Rd/Jonathan Dr and Rt-6N/E Main St/Curry St
8/29/2016 7:06:59 PM
Normal services not operating in Septa
8/29/2016 5:13:35 AM
Normal services not operating in Septa Regional Rails
8/29/2016 12:09:04 PM
Adams Ave/Whitaker Ave - Closed due to road construction in Lawncrest on Adams AVE Both NB/SB between Rising SUN AVE and Crescentville Rd
8/29/2016 12:16:23 PM
Aramingo Ave - On-ramp closed in Frankford on Aramingo Ave Both NB/SB at Ramp To I-95 SB
8/29/2016 12:09:04 PM
Benjamin Franklin Pkwy - New road construction layout in Philadelphia on Ben Franklin Parkway Inbound between 21st St and Logan Square
8/29/2016 12:09:04 PM
Benjamin Franklin Pkwy - Major road construction in Center City on Ben Franklin Parkway Outbound between Logan Square and 20th St
8/29/2016 10:56:14 AM
Benjamin Franklin Pkwy - Major event in Center City on Ben Franklin Parkway Both EB/WB at Art Museum Circle/Eakins Oval/Kelly Dr
8/29/2016 9:06:45 PM
I-76 - Slow traffic - Slow traffic in Philadelphia on I-76 WB between University Ave and South St/Exit 346
8/29/2016 8:17:44 AM
I-95 - On-ramp closed in Philadelphia on I-95 NB at Girard Ave/Exit 23
8/29/2016 9:08:58 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Philadelphia on I-95 SB between Bridge St/Exit 27 and Betsy Ross Bridge/Exit 26, road construction, roadway reduced to two lanes at Betsy Ross Bridge/Exit 26
8/29/2016 8:05:04 PM
I-95 - On-ramp closed on I-95 NB at Cottman Ave/Exit 30
8/29/2016 8:17:44 AM
I-95 - On-ramp closed in Philadelphia on I-95 NB at Allegheny Ave/Exit 25
8/29/2016 9:08:58 PM
I-95 - Slow traffic - Estimated delay 00:01 - Slow traffic in Philadelphia on I-95 SB between Bridge St/Exit 27 and Betsy Ross Bridge/Exit 26, road construction, roadway reduced to two lanes at Betsy Ross Bridge/Exit 26
8/29/2016 6:48:18 AM
N Delaware Ave - Construction work in Philadelphia on Delaware Ave Both EB/WB between Frankford Ave and I 95/Delaware Ave/Aramingo Ave
8/29/2016 8:17:44 AM
N Delaware Ave - Off-ramp closed in Fishtown on NB Delaware AVE WB at I 95/Delaware Ave/Aramingo Ave
8/29/2016 9:12:00 PM
PA-63 - Slow traffic - Estimated delay 00:02 - Slow traffic in NE. Philadelphia on Rt-63 WB between US-1/Roosevelt Blvd and US-1/E Roosevelt Blvd
8/29/2016 10:06:09 AM
Passyunk Ave - Road construction, roadway reduced to one lane in South Philadelphia on Passyunk Ave WB between 28th St and 61st St
8/29/2016 5:37:52 PM
Pattison Ave - Baseball in Citizens Bank Park on Pattison Ave Both EB/WB at S Darien St
8/29/2016 12:14:00 PM
Richmond St - Closed due to road construction in PORT Richmond on Richmond St SB between Lehigh Ave and Delaware Ave
8/29/2016 9:12:00 PM
Roosevelt Blvd Frontage - Slow traffic - Estimated delay 00:02 - Slow traffic in Philadelphia on Roosevelt Blvd Frontage WB between PA-63/Woodhaven Rd and PA-63/Red Lion Rd
8/29/2016 9:16:00 PM
Roosevelt Blvd Frontage - Slow traffic - Estimated delay 00:01 - Slow traffic in Philadelphia on Roosevelt Blvd Frontage EB between Welsh Rd and Grant Ave
8/29/2016 9:14:00 PM
Roosevelt Blvd Frontage - Slow traffic - Estimated delay 00:02 - Slow traffic in Philadelphia on Roosevelt Blvd Frontage EB between PA-63/Woodhaven Rd and US 1/Roosevelt Blvd
8/29/2016 9:16:00 PM
Roosevelt Blvd Frontage - Slow traffic - Estimated delay 00:01 - Slow traffic in Philadelphia on Roosevelt Blvd Frontage WB between Grant Ave and Welsh Rd
8/29/2016 12:30:00 PM
Spring Garden St - Closed due to major event in Philadelphia on Spring Garden St Both EB/WB between Pennsylvania AVE and Kelly Drive/Ben Franklin Parkway
8/29/2016 9:16:00 PM
US-1 - Slow traffic - Estimated delay 00:01 - Slow traffic in NE Philadelphia on Roosevelt Blvd (NE Philly) NB between Welsh Rd and Grant Ave
8/29/2016 9:12:00 PM
US-1 - Slow traffic - Estimated delay 00:01 - Slow traffic in NE. Philadelphia on Roosevelt Blvd (NE Philly) SB between Byberry Rd and Red Lion Rd
8/29/2016 9:16:00 PM
US-1 - Slow traffic - Estimated delay 00:01 - Slow traffic in NE Philadelphia on Roosevelt Blvd (NE Philly) SB between Grant Ave and Welsh Rd
8/29/2016 10:02:21 AM
W Sedgley Ave - Closed due to road construction in North Philadelphia on W Sedgley Ave Both EB/WB between W Allegheny Ave and W Erie Ave
8/29/2016 12:15:30 PM
Walnut Ln - Closed due to road construction in Philadelphia on Walnut Ln Both EB/WB between Park Line Dr and Henry Ave as reported by penndot
8/29/2016 12:15:30 PM
Wissinoming St - Construction work in Philadelphia on Wissinoming St WB between I 95/Delaware Ave and Cottman Ave as reported by penndot
8/29/2016 12:13:59 PM
I-295 - Construction work in Westville on I-295 Both NB/SB between Rt-47/Exit 25 and Rt-42/Exit 26
8/29/2016 9:16:00 PM
NJ-42 - Slow traffic - Slow traffic in Washington Twp on Rt-42 SB between Ganttown Rd and Fries Mill Rd
8/29/2016 6:38:17 AM
NJ-42 - Long-term road construction in Deptford on Rt-42 Both NB/SB between Rt-544/Exit 12 and I-295 as reported by njtoc
8/29/2016 9:10:00 PM
NJ-47 - Slow traffic - Estimated delay 00:01 - Slow traffic in Glassboro on Rt-47/Delsea Dr NB between Greentree Rd and Woodbury Rd
8/29/2016 9:14:00 PM
NJ-47 - Slow traffic - Estimated delay 00:01 - Slow traffic in Glassboro on Rt-47/Delsea Dr NB between Stanger Ave and US-322/High St
8/29/2016 9:10:00 PM
NJ-47 - Slow traffic - Estimated delay 00:01 - Slow traffic in Cumberland on Rt-47/Delsea Dr NB between Hunters Mill Rd and Rt-347 (SB Split/NB Merge)
8/29/2016 9:16:00 PM
NY-27 - Slow traffic - Estimated delay 00:01 - Slow traffic in Bellmore on Sunrise Hwy/NY Rt-27 WB between Bellmore Ave and Newbridge Rd
8/29/2016 9:14:00 PM
NY-27 - Slow traffic - Slow traffic in Wantagh on Sunrise Hwy/NY Rt-27 EB between Wantagh Pwy and Wantagh Ave
8/29/2016 7:34:32 PM
I-84 - Road construction, right lane closed in Waterbury on I 84 EB between Exit 25a Austin Rd and Exit 27 I-691 (E)
8/29/2016 7:40:21 PM
I-84 - Road construction, left lane closed in Waterbury on I 84 WB between Exit 19 Rt 8 South and Exit 18 Chase Pkwy (E) / West Main St / Highland Ave (W)
8/29/2016 8:19:30 PM
I-91 - Construction work in Wallingford on I 91 SB between Exit 15 Rt 68 and Exit 14 Rt 150 / East Center St
8/29/2016 8:24:21 PM
I-95 - Road construction, right lane closed in Milford on I-95 SB between Exit 34 Rt 1 and Exit 32 West Broad St
8/29/2016 9:16:00 PM
US-1 - Slow traffic - Estimated delay 00:04 - Slow traffic in Guilford on US-1/Post Rd/Ct NB between I 95 (Guilford) and Hwy 146/Boston St
8/29/2016 9:16:00 PM
US-5 - Slow traffic - Estimated delay 00:01 - Slow traffic in Meriden on US 5 SB between Hwy 15/Wilbur Cross Pkwy/Canyon Dr and Westfield Rd
8/29/2016 6:46:50 AM
Carter Rd/Hopewell Princeton Rd - Closed due to road construction in Lawrence on Carter Rd (CR-569) Both NB/SB between US 206/Lawrenceville Rd/Main St and Rosedale Rd
8/29/2016 9:16:00 PM
US-1 - Slow traffic - Estimated delay 00:01 - Slow traffic in Lawrence on Rt-1 (Bucks/Mercer) NB between US-1/Brunswick Pike and Bakers Basn Rd/Frankln Cornr Rd
8/29/2016 9:08:00 PM
US-130 - Slow traffic - Estimated delay 00:01 - Slow traffic in Hamilton Twp on US-130/South Jersey SB between I-195 and Crosswicks Hamilton Sqr Rd/Klockner
8/29/2016 9:14:00 PM
US-1 & US-9 - Slow traffic - Slow traffic in Rahway on Rt 1-9 (Including Pulaski Skyway & Covered Rdway/Rt-139) NB between Hancock St and CR-13/Grand Ave
8/29/2016 9:14:00 PM
US-1 & US-9 - Slow traffic - Slow traffic in Elizabeth on Rt 1-9 (Including Pulaski Skyway & Covered Rdway/Rt-139) NB between North Ave/Nwk Liberty A'Port Service Rd and North Ave/Rt 81/Elizabeth Shopping
8/29/2016 8:40:39 PM
US-22 - Road construction, right lane closed in Scotch Plains on Rt-22/NJ WB between Westfield Rd and Chimney Rock Rd
8/29/2016 9:16:00 PM
US-22 - Slow traffic - Estimated delay 00:01 - Slow traffic in Philipsburg on US-22 WB between I-78 and CR-519/Saint James Ave/Uniontown Rd
8/29/2016 9:26:26 AM
Chews Landing Rd - Closed due to road construction in Gloucester Twp on Chews Landing Rd Both EB/WB between Rt-168/Black Horse Pike and Laurel Rd as reported by police
8/29/2016 6:47:54 AM
I-295 - Construction work in Bellmawr on I-295 Both NB/SB between Rt-42 (#26) and Rt-168/Exit 28
8/29/2016 7:08:54 PM
I-295 - Off-ramp closed in Bellmawr on I-295 NB at US-30/Exit 29
8/29/2016 1:01:14 PM
US-30 - New road construction layout in Winslow Twp on Rt-30 (White Horse Pk) Both EB/WB between Wiltseys Mill Rd and NJ-143/Spring Garden Rd
8/29/2016 9:16:00 PM
US-30 - Slow traffic - Estimated delay 00:02 - Slow traffic in Berlin on Rt-30 (White Horse Pk) EB between Cross Keys Rd and Rt-73
8/29/2016 9:16:00 PM
US-30 - Slow traffic - Estimated delay 00:02 - Slow traffic in Berlin on Rt-30 (White Horse Pk) WB between Rt-73 and Cross Keys Rd
8/29/2016 8:04:02 PM
Special parking restrictions in force in New York City
8/29/2016 9:14:19 PM
FDR Dr - Incident cleared on The FDR Drive SB at 79th St
8/29/2016 9:12:50 PM
Queensboro Bridge WB (Lower Level) - Bridge closed in Area of Upper East River Crossings: 59th St/Ed Koch Br Lower/Nyc on The Queensboro/Ed Koch/59th St BR Lower Outer To Queens EB between Manhattan Side and Queens Side
8/29/2016 8:02:38 PM
I-295 - Bridge maintenance operations in Warwick on I 295 NB over EX 2 - Bald Hill Rd as reported by ridot
8/29/2016 6:05:54 AM
I-295 - Road construction, shoulder closed in Warwick on I 295 Both NB/SB at EX 1 - East Ave as reported by ridot
8/29/2016 8:02:38 PM
I-295 - Slow moving maintenance vehicle in Warwick on I 295 Both NB/SB between Rt 95 Warwick and RI / Mass Line as reported by ridot
8/29/2016 8:02:38 PM
I-95 - Road construction, two lanes closed in Warwick on I 95 Both NB/SB at EX 13 - Airport Connector as reported by ridot
8/28/2016 7:49:32 PM
RI-2 - Road construction, right lane closed in East Greenwich on Rt. 2 / South County Trail Both NB/SB over Hwy 4 as reported by ridot
8/28/2016 7:49:32 PM
RI-2 - Road construction, shoulder closed in Warwick on Bald Hill Rd. / Rt. 2 Both NB/SB between Hwy 113/East Ave and I 295 as reported by ridot
8/28/2016 7:49:32 PM
RI-4 - Road construction, shoulder closed in North Kingstown on Rt 4 Both NB/SB under EX 6 - South County Trail/Rt 2 as reported by ridot
8/29/2016 8:02:38 PM
I-295 - Slow moving maintenance vehicle in Providence on I 295 Both NB/SB at EX 8 - Douglas Pike as reported by ridot
8/28/2016 7:49:32 PM
RI-5 - Road construction, single line traffic-alternate directions in North Smithfield on Rt. 5 / Providence Pike Both NB/SB approaching Main St as reported by ridot
8/29/2016 8:02:38 PM
US-6 - Construction work in Johnston on Rt 6 Both EB/WB between I-295 and Rt. 10/ 6-10 Connector as reported by ridot
8/29/2016 8:02:38 PM
I-95 - Slow moving maintenance vehicle in CT / RI Line on I 95 Both NB/SB between RI/CT State Line and EX 7 - New London Tpk as reported by ridot
8/28/2016 7:49:32 PM
US-1 - Road construction, shoulder closed in Narragansett on Rt 1 NB at Woodruff Ave as reported by ridot
8/29/2016 9:26:17 AM
NJ-50 - Long-term road construction in Tuckahoe on Rt-50 Both NB/SB at Rt-49

More From CBS New York

Komen Race For The Cure
CAMPAIGN 2016

Listen Live